16 Tex. Admin. Code § 11.141 - Groundwater Quality and Well Information
(a) At least 15 days prior to commencement of
drilling, a permittee whose permit authorizes exploration in a groundwater
conservation district shall obtain groundwater samples for analysis in
accordance with this subsection. Within 90 days of receiving the laboratory
analysis data, the permittee shall provide to the district pre-exploration
groundwater quality information as follows:
(1) from each existing well located in a
groundwater conservation district that is tested by the permittee before
exploration; and
(2) from the
following wells, as applicable:
(A) if there
are fewer than 10 existing wells located inside the approved exploration area,
from each well located inside the approved exploration area; or
(B) if there are at least 10 existing wells
located inside the approved exploration area, from 10 existing wells that are
distributed as evenly as possible throughout that area.
(b) Within 90 days of receiving
the laboratory analysis data, a permittee whose permit authorizes exploration
in a groundwater conservation district shall provide to the district
groundwater quality information obtained during exploration within the district
as follows:
(1) from each existing well that
the permittee tests during exploration; and
(2) from each cased exploration well
completed under the exploration permit.
(c) Each permittee shall conform the
groundwater quality information required under subsections (a) and (b) of this
section to the requirements of §
11.142 of this title (relating to
Groundwater Analysis and Reporting).
(d) Each permittee whose permit authorizes
exploration in a groundwater conservation district shall file with the division
the groundwater quality information required under subsections (a) and (b) of
this section at the same time the information is provided to the
district.
(e) Each exploration
permittee that installs cased exploration wells inside a groundwater
conservation district shall provide to the district, within 60 days of the
installation, the following information:
(1)
the permittee's name, address, and telephone number; and
(2) the following information for each cased
exploration well in the district:
(A) well
completion information;
(B) well
logs, except any information determined by the director to be confidential
pursuant to §
11.74 of this title (relating to
Information Subject to Public Review);
(C) the location of the well, including a
legal description and the acreage of the property where the well is
located;
(D) verification that the
well will be used for an industrial purpose; and
(E) the type and capacity of the pump used in
the well.