16 Tex. Admin. Code § 12.335 - Topsoil: Removal
(a) Timing. Topsoil
shall be removed after vegetative cover that would interfere with the use of
the topsoil is cleared from the areas to be disturbed, but before any drilling,
blasting, mining, or other surface disturbance.
(b) Materials to be removed. All topsoil
shall be removed in a separate layer from the areas to be disturbed, unless use
of substitute or supplemental materials is approved by the Commission in
accordance with subsection (e) of this section. If use of substitute or
supplemental materials is approved, all materials to be redistributed shall be
removed.
(c) Materials to be
removed in thin topsoil situations. If the topsoil is less than six inches, a
six-inch layer that includes the A horizon and the unconsolidated materials
immediately below the A horizon or the A horizon and all unconsolidated
material if the total available is less than six inches, shall be removed and
the mixture segregated and redistributed as the surface soil layer, unless
topsoil substitutes are approved by the Commission pursuant to subsection (e)
of this section.
(d) Subsoil
segregation. The B horizon and portions of the C horizon, or other underlying
layers demonstrated to have qualities for comparable root development shall be
segregated and replaced as subsoil, if the Commission determines that either of
these is necessary or desirable to ensure soil productivity consistent with the
approved postmining land use.
(e)
Topsoil substitutes and supplements.
(1)
Selected overburden materials may be substituted for or used as a supplement to
topsoil, if the Commission determines that the resulting soil medium is equal
to or more suitable for sustaining revegetation than is the available topsoil
and the substitute material is the best available to support revegetation. This
determination shall be based on the results of chemical and physical analyses
of overburden and topsoil. These analyses shall include determinations of pH,
net acidity or alkalinity, phosphorus, potassium, texture class, and other
analyses as required by the Commission. The Commission may also require that
results of field-site trials or greenhouse tests be used to demonstrate the
feasibility of using these overburden materials.
(2) Results of analyses, trials, and tests
shall be submitted to the Commission. Certification of trials and tests shall
be made by a laboratory approved by the Commission stating that:
(A) the proposed substitute material is equal
to or more suitable for sustaining the vegetation than is the available
topsoil;
(B) the substitute
material is the best available material to support the vegetation;
and
(C) the trials and tests were
conducted using standard testing procedures.
(3) Substituted or supplemental material
shall be removed, segregated, and replaced in compliance with the requirements
for topsoil under this section.
(f) Limits on topsoil removal area. Where the
removal of vegetative material, topsoil, or other materials may result in
erosion which may cause air or water pollution:
(1) the size of the area from which topsoil
is removed at any one time shall be limited;
(2) the surface soil layer shall be
redistributed at a time when the physical and chemical properties of topsoil
can be protected and erosion can be minimized; and
(3) such other measures shall be taken as the
Commission may approve or require to control erosion.