16 Tex. Admin. Code § 12.344 - Hydrologic Balance: Siltation Structures
(a) Scope. For the purposes of this section
only, disturbed areas shall not include those areas:
(1) in which the only surface mining
activities include diversion ditches, siltation structures, or roads that are
designed, constructed and maintained in accordance with
§§12.330-12.343, this section, and §§
12.345-12.403 of this title (relating to
Permanent Program Performance Standards--Surface Mining Activities);
and
(2) for which the upstream area
is not otherwise disturbed by the operator.
(b) General requirements.
(1) Additional contributions of suspended
solids sediment to streamflow or runoff outside the permit area shall be
prevented to the extent possible using the best technology currently
available.
(2) All surface drainage
from the disturbed area shall be passed through a siltation structure before
leaving the permit area, except as provided in paragraph (5) of this subsection
or subsection (e) of this section.
(3) Siltation structures for an area shall be
constructed before beginning any surface mining activities in that area, and
upon construction shall be certified by a qualified professional engineer to be
constructed as designed and as approved in the reclamation plan.
(4) Any siltation structure which impounds
water shall be designed, constructed and maintained in accordance with §
12.347 of this title (relating to
Hydrologic Balance: Permanent and Temporary Impoundments).
(5) Siltation structures shall be maintained
until the disturbed area has been stabilized and revegetated and removal is
authorized by the Commission. In no case shall the structure be removed sooner
than two years after the last augmented seeding.
(6) When a siltation structure is removed,
the land on which the siltation structure was located shall be regraded and
revegetated in accordance with the reclamation plan and §§
12.390-12.395 of this title (relating to
Revegetation: General Requirements, to Revegetation: Use of Introduced Species,
to Revegetation: Timing, to Revegetation: Mulching and Other Soil Stabilizing
Practices, and to Revegetation: Standards for Success). Sedimentation ponds
approved by the Commission for retention as permanent impoundments may be
exempted from this requirement.
(c) Sedimentation ponds.
(1) When used, sedimentation ponds shall:
(A) be used individually or in
series;
(B) be located as near as
possible to the disturbed area and out of perennial streams unless approved by
the Commission; and
(C) be
designed, constructed, and maintained to:
(i)
provide adequate sediment storage volume. The minimum sediment storage volume
shall be equal to the three year accumulated sediment volume from the drainage
area to the pond. The sediment volume shall be determined using the Universal
Soil Loss Equation, gully erosion rates, and the sediment delivery ratio
converted to sediment volume, using either the sediment density or other
empirical methods approved by the Commission;
(ii) provide adequate detention time to allow
the effluent from the ponds to meet state and federal effluent limitations. The
minimum detention time without a chemical treatment process shall be 10
hours;
(iii) contain or treat the
10-year, 24-hour precipitation event ("design event") unless a lesser design
event is approved by the Commission based on terrain, climate, other
site-specific conditions and on a demonstration by the operator that the
effluent limitations of §
12.340 of this title (relating to
Hydrologic Balance: Water-Quality Standards and Effluent Limitations) will be
met;
(iv) provide a nonclogging
dewatering device adequate to maintain the detention time required under clause
(ii) of this subparagraph;
(v)
minimize, to the extent possible, short circuiting;
(vi) provide periodic sediment removal
sufficient to maintain adequate volume for the design event;
(vii) ensure against excessive
settlement;
(viii) be free of sod,
large roots, frozen soil, and acid- or toxic-forming coal-processing waste;
and
(ix) be compacted
properly.
(2) A
sedimentation pond shall include either a combination of principal and
auxiliary spillways or single spillway configured as specified in §
12.347(a)(9) of
this title (relating to Hydrologic Balance: Permanent and Temporary
Impoundments).
(d) Other
treatment facilities.
(1) Other treatment
facilities shall be designed to treat the 10-year, 24-hour precipitation event
unless a lesser design event is approved by the Commission based on terrain,
climate, other site-specific conditions and a demonstration by the operator
that the effluent limitations of §
12.340 of this title (relating to
Hydrologic Balance: Water-Quality Standards and Effluent Limitations) will be
met.
(2) Other treatment facilities
shall be designed in accordance with the applicable requirements of subsection
(c) of this section.
(e)
Exemptions. Exemptions to the requirements of this section may be granted if:
(1) the disturbed drainage area within the
total disturbed area is small; and
(2) the operator demonstrates that siltation
structures and alternate sediment control measures are not necessary for
drainage from the disturbed area to meet the effluent limitations under §
12.340 of this title (relating to
Hydrologic Balance: Water-Quality Standards and Effluent Limitations) and the
applicable state and federal water-quality standards for the receiving
waters.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.