16 Tex. Admin. Code § 12.358 - Use of Explosives: Pre-Blasting Survey
(a) At least 30 days before initiation of a
blasting program, the operator shall notify, in writing, all residents or
owners of dwellings or other structures located within 1/2 mile of any part of
the permit area regarding how to request a preblasting survey. The request
shall be made, in writing, directly to the operator or to the Commission who
shall promptly notify the operator. The operator shall promptly conduct a
pre-blasting survey of the dwelling or structure and promptly submit a report
of the survey to the Commission and to the person requesting the survey. If a
structure is renovated or modified subsequent to a pre-blast survey, then upon
request a survey of such additions and renovations shall be performed by the
operator in accordance with this section.
(b) The operator shall determine the
condition of the dwelling or structure and shall document any pre-blasting
damage and other physical factors that could reasonably be affected by the
blasting. Assessments of structures such as pipelines, pipes, cables,
transmission lines, cisterns, wells, and other water systems warrant special
attention; however, assessment of these structures may be limited to surface
conditions and other readily available data. Special attention shall be given
to the pre-blasting condition of wells and other water systems used for human,
animal, or agricultural purposes and to the quantity and quality of the
water.
(c) A written report of the
survey shall be prepared and signed by the person who conducted the survey. The
report may include recommendations of any special conditions or proposed
adjustments to the blasting procedure which should be incorporated into the
blasting plan to prevent damage. Copies of the report shall be promptly
provided to the person requesting the survey and to the Commission. If the
person requesting the survey disagrees with the results of the survey, he or
she may notify, in writing, both the operator and the Commission of the
specific areas of disagreement.
(d)
Any pre-blasting surveys requested before the 10th day before the planned
initiation of blasting shall be completed by the operator before the initiation
of blasting.