16 Tex. Admin. Code § 14.2619 - Installation of Piping

(a) Fuel lines shall be supported at least every 21 to 27 inches.
(b) Joint compound or tape acceptable for use with LNG shall be applied to all male pipe threads prior to assembly.
(c) Piping and fittings shall be clean and free from cutting or threading burrs and scaling. The ends of all piping shall be reamed.
(d) Bends in piping or tubing are prohibited if the bend weakens the pipe or tubing. Bends shall be made by bending tools designated for this purpose.
(e) Joints or connections shall be located only in an accessible location.

Notes

16 Tex. Admin. Code § 14.2619
The provisions of this §14.2619 adopted to be effective May 26, 2003, 28 TexReg 4100; Amended by Texas Register, Volume 46, Number 07, February 12, 2021, TexReg 1051, eff. 2/15/2021

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.