16 Tex. Admin. Code § 18.5 - Operator and Excavator Obligations with Respect to Positive Response
(a) Upon being
contacted by the notification system, an operator shall provide a positive
response within the time frames specified in Texas Utilities Code, Chapter 251,
by either:
(1) marking the operator's
underground pipelines in accordance with the requirements of Texas Utilities
Code, Chapter 251, and this chapter; or
(2) notifying the excavator that the operator
has no underground pipelines in the vicinity of the proposed excavation area.
The operator shall provide this "all clear" or "no conflict" notice using the
method or methods that the excavator specified in accordance with §
18.3 of this title, relating to
Excavator Notice to Notification Center.
(b) Both the excavator and the operator shall
make a record of the positive response regarding each line locate ticket
received.
(c) An excavator that
gives a second notice to the notification center pursuant to §
18.4(e) of this
title, relating to Excavator Obligation to Avoid Damage to Underground
Pipelines, because an operator failed to provide a positive response to an
excavator shall report that fact to the Commission through TDRF as set forth in
§
18.11 of this title, relating to
Reporting Requirements. An excavator shall also report an operator's failure to
provide a positive response to a second call to the Commission through TDRF as
specified in §18.11.
(d) An
operator that receives a notice of damage to its underground pipeline through a
notification center pursuant to §
18.11(b) of this
title, relating to reporting requirements, shall respond within four
hours.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.