16 Tex. Admin. Code § 25.95 - Electric Utility Infrastructure Storm Hardening
(a) Purpose. This section is intended to
ensure that each electric utility has developed a Storm Hardening Plan that
provides for the implementation of cost-effective strategies to increase the
ability of its transmission and distribution facilities to withstand extreme
weather conditions.
(b)
Application. This section applies to all electric utilities.
(c) Definition. The following term when used
in this section shall have the following meaning, unless the context indicates
otherwise. Storm hardening--All activities related to improved resiliency and
restoration times, including but not limited to emergency planning,
construction standards, vegetation management, or other actions before, during,
or after extreme weather events.
(d) Storm Hardening Plan Summary. By May 1,
2011, a utility shall file with the commission a summary of its Storm Hardening
Plan. The summary shall describe in detail the utility's current and future
storm hardening plans over a five-year period beginning January 1, 2011. By May
1 of each subsequent year, the utility shall file a detailed summary of any
material revisions to the Plan and a detailed summary of its progress in
implementing the Plan. A full copy of the Plan shall be provided to the
commission or commission staff upon request.
(e) Updating and contents of Storm Hardening
Plan. A utility's Storm Hardening Plan shall be updated at least every five
years and shall include, at a minimum, the utility's:
(1) Construction standards, policies,
procedures, and practices employed to enhance the reliability of utility
systems, including overhead and underground transmission and distribution
facilities;
(2) Vegetation
Management Plan for distribution facilities, including a tree pruning
methodology and pruning cycle, hazard tree identification and mitigation plans,
and customer education and notification practices related to vegetation
management;
(3) Plans and
procedures to consider infrastructure improvements for its distribution system
based on smart grid concepts that provide enhanced outage resilience, faster
outage restoration, and/or grid self-healing;
(4) Plans and procedures to enhance post
storm damage assessment, including enhanced data collection methods for damaged
poles and fallen trees;
(5)
Transmission and distribution pole construction standards, pole attachment
policies, and pole testing schedule;
(6) Distribution feeder inspection
schedule;
(7) Plans and procedures
to enhance the reliability of overhead and underground transmission and
distribution facilities through the use of transmission and distribution
automation;
(8) Plans and
procedures to comply with the most recent National Electric Safety Code (NESC)
wind loading standards in hurricane prone areas for new construction and
rebuilds of the transmission and distribution system;
(9) Plans and procedures to review new
construction and rebuilds to the distribution system to determine whether they
should be built to NESC Grade B (or equivalent) standards;
(10) Plans and procedures to develop a
damage/outage prediction model for the transmission and distribution
system;
(11) Plans and procedures
for use of structures owned by other entities in the provision of distribution
service, such as poles owned by telecommunications utilities; and
(12) Plans and procedures for restoration of
service to priority loads and for consideration of targeted storm hardening of
infrastructure used to serve priority loads.
(f) Comments. Interested entities may file
comments to the commission staff within 30 days of a utility's filing pursuant
to subsection (d) of this section.