16 Tex. Admin. Code § 26.53 - Inspections and Tests
(a) This section
does not apply to the retail services of an electing company, as defined by
Public Utility Regulatory Act (PURA) §58.002, or to the retail nonbasic
services offered by a transitioning company, as defined by PURA
§65.002.
(b) Each dominant
certificated telecommunications utility (DCTU) must adopt a program of periodic
tests, inspections, and preventive maintenance aimed at achieving efficient
operation of its system and rendition of safe, adequate, and continuous
service.
(c) Each DCTU must
maintain or have access to test facilities enabling it to determine the
operating and transmission capabilities of all equipment and facilities. The
actual transmission performance of the network must be monitored to determine
if the service objectives in this chapter are met. This monitoring function
must include circuit order tests prior to placing trunks in service, routine
periodic trunk maintenance tests, tests of actual switched trunk connections,
periodic noise tests of a sample of customer loops in each exchange, and
special transmission surveys of the network.
(d) Each central office serving more than 300
customer access lines must be equipped with a 1,000 +/- 20 hertz, one milliwatt
test signal generator and a 900 Ohm balanced termination device wired to
telephone numbers so that they may be accessed for dial test purposes. Upon
commission request, each DCTU must provide the commission the numbers assigned
for these test terminations.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.