16 Tex. Admin. Code § 3.18 - Mud Circulation Required
When coming out of the hole with the drill pipe, drilling fluid shall be circulated until equalized, and a fill-up line shall be turned into the casing to insure a full load of fluid on the bottom of the hole at all times.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.