16 Tex. Admin. Code § 3.21 - Fire Prevention and Swabbing
(a) No
hydrocarbon flow tank, unless entirely buried, shall hereafter be placed nearer
than 150 feet from any derrick, rig, building, power plant, or boiler of any
description. The director of the Oil and Gas Division or his delegate may
administratively grant exceptions to this requirement. If the director of the
Oil and Gas Division declines to administratively grant, continue, or extend an
exception, the operator shall move the hydrocarbon flow tank to the required
distance or request a hearing on the matter. After hearing, the examiner shall
recommend final action to the commission.
(b) No field working hydrocarbon tank having
a capacity of 10,000 barrels or more shall be built nearer than 200 feet
(measured from shell to shell) to any other like tank.
(c) No person engaged in the production,
transportation, storage, handling, refining, reclaiming, processing, treating,
or marketing of crude petroleum oil or the products or by-products thereof
shall store, either permanently or temporarily, crude petroleum oil or the
products and by-products thereof in open pits or earthen storage.
(d) All oil tanks where there is a gas hazard
shall be gas tight and provided with proper gas vents.
(e) No forge or open light shall be placed
inside the derrick of a well showing oil or gas.
(f) Boilers must be equipped with steam lines
for fighting fire and must not be set nearer than 150 feet to any producing
well.
(g) All wells shall be
cleaned into a pit not less than 40 feet from the derrick floor and 150 feet
from any fire hazard.
(h) No boiler
or electric lighting generator shall be placed or remain nearer than 150 feet
to any producing well or oil tank.
(i) Any rubbish or debris that might
constitute a fire hazard shall be removed to a distance of at least 150 feet
from the vicinity of any well, tank, or pump station. All waste shall be burned
or disposed of in such manner as to avoid creating a fire hazard.
(j) Dikes or fire walls shall not be required
except such fire walls must be erected and kept around all permanent oil tanks,
or battery of tanks, that are within the corporate limits of any city, town, or
village; or where such tanks are closer than 500 feet to any highway or
inhabited dwelling or closer than 1,000 feet to any school or church; or where
such tanks are so located as to be deemed by the commission to be an
objectionable hazard.
(k) Swabbing,
bailing, or air jetting of wells is prohibited as a production method for wells
unless the Commission has, after notice and hearing, granted an exception to
this subsection. The Commission shall give notice of the hearing at least 10
days prior to the date of the hearing.
(1) An
operator seeking an exception to allow swabbing, bailing, or air jetting of a
well shall:
(A) provide the Commission with
the names and mailing addresses of the mineral interest owners of record and
surface owners of record of the lease on which a well for which an exception is
sought is located;
(B) present
evidence at the hearing establishing:
(i) the
method of production proposed;
(ii)
that any production is properly accounted for pursuant to §
3.26 of this title (relating to
Separating Devices, Tanks, and Surface Commingling of Oil);
(iii) that the proposed exception is
necessary to prevent waste or protect correlative rights;
(iv) that wellhead control is sufficient to
prevent releases from the well;
(v)
that no pollution of usable quality water or safety hazard will result from
either the proposed production method or the condition of the well;
and
(vi) that the operator
possesses a continuing good faith claim to the right to operate the
well.
(2) In
addition to the information set out in paragraph (1) of this subsection,
factors that the Commission may consider in ruling on a request for an
exception include:
(A) whether the well has
passed a mechanical integrity test within the preceding 12 months;
(B) the estimated monthly and cumulative
production from the well if the requested exception is granted;
(C) whether production will be into an
on-lease tank battery or a mobile tank;
(D) the adequacy of the financial assurance
provided by the operator to assure that the well will be timely and properly
plugged;
(E) whether production
volume, fine sands in the reservoir, or other factors render pumping of the
well impracticable;
(F) whether the
reservoir from which the well produces contains hydrogen sulfide; and
(G) the operator's history of compliance with
Commission rules.
(3)
This section does not prohibit swabbing as a non-recurring method to start
initial production, to test or clean out a well, or to restore a well to
flowing or pumping status.
(l) Operation and maintenance of electrical
power lines. An operator must construct, operate, and maintain an electrical
power line serving a well site or other surface facility employed in operations
incident to oil and gas development and production in accordance with the
National Electrical Code published by the National Fire Protection Association
and adopted by the Texas Department of Licensing and Regulation in §
73.100 of this title (relating to
Technical Requirements).