16 Tex. Admin. Code § 4.124 - [Effective 7/1/2025] Requirements Applicable to All Permit Applications and Reports
(a) Unless
otherwise specified by rule, a permit application shall be filed with the
Technical Permitting Section. The application shall be filed by mail, hand
delivery, or by an electronic process approved by the Director. A permit
application shall be considered filed with the Commission on the day it is
date-stamped by the Commission's office in Austin.
(b) The permit application shall contain
information addressing each applicable application requirement and all
information necessary to initiate the final review by the Technical Permitting
Section, including all information required by this division and the applicable
provisions of Divisions 5 through 9 of this subchapter, as described in §
4.120 of this title (relating to
General Requirements for All Permitted Operations).
(c) When a Commission prescribed application
form exists, either in paper or electronic form, an applicant shall apply on
the prescribed form according to the form instructions. When a Commission
prescribed application form does not exist, the permit application shall
contain a signature, printed name, contact telephone number or email address,
the date of signing, and the following certification: "I certify that I am
authorized to make this application, that this application was prepared by me
or under my supervision and direction, and that the data and facts stated
herein are true, correct, and complete to the best of my knowledge."
(d) The permit application shall contain the
following information for the applicant:
(1)
the applicant's organization name;
(2) the applicant's organization report (P-5)
number;
(3) the applicant's
physical address, and mailing address if different;
(4) the name, telephone number, and email
address of a contact person for the application, which can be someone within
the applicant's organization or an agent;
(5) the identifying name of the proposed
facility; and
(6) a general
narrative description of the proposed management of oil and gas wastes at the
facility.
(e) The
technical data in the permit application shall comply with the following
requirements.
(1) All geographic coordinates
submitted to the Technical Permitting Section shall use the North American
Datum (NAD) 83, in decimal degrees to six decimal places of longitude and
latitude.
(2) All maps, plans, and
diagrams submitted to the Technical Permitting Section shall be drawn to scale
and include a scale, north arrow, title block, and legend. Maps shall be of
material suitable for a permanent record and shall be on sheets 8-1/2 inches by
11 inches or, alternatively, 8-1/2 inches by 14 inches or 11 inches by 17
inches folded to standard letter size.
(3) All chemical laboratory analyses
submitted to the Technical Permitting Section are required to be performed in
accordance with the following.
(A) All
chemical laboratory analyses shall be conducted using appropriate EPA methods
or standard methods by an independent National Environmental Laboratory
Accreditation Program certified laboratory neither owned nor operated by the
permittee. Any sample collected for chemical laboratory analysis shall be
collected and preserved in a manner appropriate for that analytical method as
specified in 40 Code of Federal Regulations (CFR) Part 136. All geotechnical
testing shall be performed by a laboratory certified to conduct geotechnical
testing according to the standards specified by ASTM and certified by a
professional engineer licensed in Texas.
(B) All chemical laboratory analytical
results shall include the full laboratory analytical report and the
corresponding chain of custody.
(4) All NORM screening surveys submitted to
the Technical Permitting Section shall be performed using a properly calibrated
scintillation meter with a sodium iodide detector (or equivalent), with the
results reported in microroentgens per hour. The manufacturer's specifications
and relevant calibration records shall be submitted to the Technical Permitting
Section for all devices used for NORM detection. All equipment, including
piping, pumps, and vessels shall be surveyed. Readings shall be taken around
the circumference of the pits and to the extent possible, over the pits. The
ground surrounding the equipment and pits shall be surveyed in a systematic
grid pattern. At a minimum, the following information shall be reported:
(A) the date of the survey;
(B) the instrument used and the last
calibration date;
(C) a background
reading;
(D) a facility diagram
showing where all readings, including the background, were taken;
(E) the readings (in microroentgens per
hour); and
(F) the full name of
the person conducting the survey.
(f) The application shall include a
stormwater management plan that contains plans and diagrams to segregate,
manage, and dispose of all contact stormwater and non-contact stormwater at the
facility.