16 Tex. Admin. Code § 4.257 - [Effective until 7/1/2025] Minimum Permit Provisions for Design and Construction
(a) A permit
issued pursuant to this division for a stationary commercial solid oil and gas
waste recycling facility shall contain any requirement that the director or the
Commission determines to be reasonably necessary to ensure that:
(1) the design and construction of storage
areas, containment dikes, and processing areas minimize contact of oil and gas
waste and partially recycled waste with the ground surface, and prevent
pollution of surface and subsurface water;
(2) the pollution of surface and subsurface
water from spills, leachate, and/or discharges from the facility is prevented
by:
(A) prohibiting the unauthorized
discharge of oil and gas waste and other substances or materials, including
contaminated storm water runoff, from the facility to the land surface at and
adjacent to the facility or to surface and subsurface water;
(B) requiring that the permittee control and
remediate spills at the facility; and
(C) requiring that the permittee make regular
inspections of the facility; and
(3) the design and construction of the
facility allows for monitoring for, and detection of, any migration of oil and
gas waste or other substance or material from the facility.
(b) A permit issued for a
stationary commercial solid oil and gas waste recycling facility pursuant to
this division shall require that the permittee:
(1) install monitoring wells in accordance
with 16 Texas Administrative Code, Part 4, Chapter 76, relating to Water Well
Drillers and Water Well Pump Installers; and
(2) submit to the Commission's office in
Austin a soil boring log and other information for each well.
(c) The soil boring log and other
information required in subsection (b) of this section shall:
(1) describe the soils using the Unified
Soils Classification System (equivalent to ASTM D 2487 and 2488);
(2) identify the method of drilling, total
depth, and the top of the first encountered water or saturated soils;
(3) include a well completion diagram for
each monitoring well;
(4) include a
survey elevation for each wellhead reference point; and
(5) include a potentiometric map showing
static water levels and the direction of groundwater flow.
(d) The Commission or the director may waive
any or all of the requirements in subsections (b) and (c) of this section if
the permittee demonstrates that an on-site boring to a minimum depth of 100
feet recovers no water during a 24-hour test.
(e) A permit for a stationary commercial
solid oil and gas waste recycling facility issued pursuant to this division
shall require that the permittee notify the Commission district office for the
county in which the facility is located prior to commencement of construction,
including construction of any dikes, and again upon completion of construction
and that the permittee may commence operations under the permit only after the
facility has been inspected by the Commission to ensure that construction of
all elements of the facility is consistent with the representations in the
application and the requirements of the permit.
(f) A permit for a stationary commercial
solid oil and gas waste recycling facility issued pursuant to this division
that requires the installation of monitoring wells shall require that the
permittee comply with subsections (b) and (c) of this section prior to
commencing recycling operations.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.