16 Tex. Admin. Code § 6.109 - Operational Standards

(a) Safety. The system must clearly be marked identifying it as a shallow closed-loop geothermal system.
(b) Pressure testing. Shallow closed-loop geothermal injection wells shall be pressure-tested with water at 100 psi (690 kPa) for 30 minutes prior to backfilling of connection (header) trenches. Any leaking loop shall be repaired or replaced prior to completing the well.
(c) Local regulation. The Commission does not require the submittal of site plans for wells authorized by rule under this subchapter. However, a site plan may be required by a local health agent, other local governmental entity, and/or a groundwater conservation district.

Notes

16 Tex. Admin. Code § 6.109
Adopted by Texas Register, Volume 50, Number 01, January 3, 2025, TexReg 0103, eff. 1/6/2025

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.