16 Tex. Admin. Code § 70.75 - Responsibilities of the Registrants - Permit/Owner Information
(a) The manufacturer shall provide the
industrialized builder, or a person who has obtained an installation permit in
accordance with § 70.20, the following information:
(1) the name, Texas registration number, and
address of the manufacturer of the building;
(2) the location of the decal(s) or insignia
on the modules or modular components;
(3) the location of the data plate and
explanation of the information thereon;
(4) a set of approved plans, in accordance
with § 70.70, as necessary to obtain a building permit and as necessary to
complete construction of the house or building at the installation site. The
documents shall include critical load points for attachment of the house or
building to the foundation, the floor plan of the building, and drawings of the
plumbing, electrical, and heating/ventilation systems;
(5) a completed signed copy of the energy
compliance checklist (referenced in § 70.70(c)(8)(C)); and
(6) the information required by §
70.78(b).
(b) The REF
builder shall provide the owner of the REF the following information:
(1) the name, Texas registration number, and
address of the REF builder;
(2) the
location of the decal(s) on the REF;
(3) the location of the data plate;
(4) a set of approved plans, in accordance
with § 70.70;
(5) other
construction documentation in accordance with § 70.70(e); and
(6) the information required by §
70.78(b).
(c) The
industrialized builder shall provide the purchaser (owner) or installation
permit holder of any industrialized house or building the following
information:
(1) the name, Texas registration
number, and address of the manufacturer or REF builder and industrialized
builder;
(2) the location of the
data plate and explanation of the information thereon;
(3) a copy of the on-site inspection reports
in accordance with § 70.73;
(4) a complete set of approved plans and
specifications in accordance with § 70.70, including all records pertinent
to alterations of the house or building in accordance with §
70.74;
(5) a copy of the foundation
system design and any unique on-site details in accordance with §
70.73;
(6) the location of the
decal(s) or insignia on the module, modular components, or site-built
REF;
(7) a site plan showing the
on-site location of all utilities and utility taps;
(8) a completed signed copy of the energy
compliance checklist (referenced in subsection (a)(5)); and
(9) for all industrialized housing and
buildings, the information required by § 70.78(b); and
(10) for industrialized housing, the
information required by § 70.78(c).
(d) The manufacturer shall maintain evidence
for a minimum of 5 years that the information in subsection (a) was delivered
to the industrialized builder or installation permit holder and provide a copy
of the evidence to the department upon request.
(e) The REF builder shall maintain evidence
for a minimum of 5 years that the information in subsection (b) was delivered
to the owner or lessee of the REF and provide a copy of the evidence to the
department upon request.
(f) The
industrialized builder shall maintain evidence for a minimum of 5 years that
the information in subsection (c) was delivered to the purchaser (owner) or
installation permit holder and provide a copy of the evidence to the department
upon request.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.