30 Tex. Admin. Code § 112.234 - Testing Requirements
(a) Perform
continuous emissions monitoring system (CEMS) relative accuracy tests in
accordance with 40 Code of Federal Regulations (CFR) §60.105a(g)(2) for
the Unit 29 FCCU Stack (EPN 29P1) and the Unit 40 FCCU Stack (EPN 40P1) and
40
CFR §
60.106a(1)(iii)
for the SRU Incinerator (EPN 34I1) and the SCOT SRU Incinerator (EPN
43I1).
(b) Perform initial and
subsequent testing of monitoring devices required by §
112.233 of this title (relating to
Monitoring Requirements) in accordance with the manufacturer's specifications
to ensure that the required monitoring instrumentation is calibrated and
functional. Initial testing must be completed by the compliance date in §
112.238 of this title (relating to
Compliance Schedules). If a monitoring device has been previously tested in
accordance with the manufacturer's specifications and a record is available to
document proper procedures were followed, then an owner or operator is not
required to repeat the initial testing again under §112.234(b)
provisions.
(c) Conduct additional
performance testing, if requested by the executive director, in compliance with
40 CFR §
60.104a to demonstrate compliance with
applicable emission limits or standards. The notification requirements of
40 CFR §
60.8(d) apply to each
initial performance test and to each subsequent performance test required by
the executive director, except for performance tests conducted for the purpose
of obtaining supplemental data because of continuous monitoring system
breakdowns, repairs, calibration checks, or zero and span adjustments. All
performance tests must be conducted using test methods allowed in §
112.235 of this title (relating to
Approved Test Methods).