30 Tex. Admin. Code § 55.152 - Public Comment Period
(a) Public
comments must be filed with the chief clerk within the time period specified in
the notice. The public comment period shall end 30 days after the last
publication of the Notice of Application and Preliminary Decision, except that
the time period shall end:
(1) 30 days after
the last publication of Notice of Receipt of Application and Intent to Obtain
Permit under §
39.418 of this title (relating to
Notice of Receipt of Application and Intent to Obtain Permit), or 30 days after
Notice of Application and Preliminary Decision if a second notice is required
under §
39.419 of this title (relating to
Notice of Application and Preliminary Decision), for an air quality permit
application not otherwise specified in this section;
(2) 30 days after the last publication of the
consolidated Notice of Receipt of Application and Intent to Obtain Permit and
Notice of Application and Preliminary Decision under §
39.603 of this title (relating to
Newspaper Notice) for a registration for a concrete batch plant under the Air
Quality Standard Permit for Concrete Batch Plants adopted by the commission
under Chapter 116, Subchapter F of this title (relating to Standard Permits),
unless the plant is to be temporarily located in or contiguous to the
right-of-way of a public works project;
(3) 30 days after the last publication of the
consolidated Notice of Receipt of Application and Intent to Obtain Permit and
Notice of Application and Preliminary Decision under §
39.603 of this title for an
application for a new permit or permit amendment under Chapter 116, Subchapters
B and G of this title (relating to New Source Review Permits and Flexible
Permits);
(4) 15 days after the
last publication of Notice of Receipt of Application and Intent to Obtain
Permit under §
39.418 of this title, or 30 days
after Notice of Application and Preliminary Decision if a second notice is
required under §
39.419 of this title, for a permit
renewal under Chapter 116 of this title (relating to Control of Air Pollution
by Permits for New Construction or Modification);
(5) 45 days after the last publication of the
notice of Application and Preliminary Decision for an application for a
hazardous waste facility permit, or to amend, extend, or renew or to obtain a
Class 3 Modification of such a permit, or 30 days after the publication of
Notice of Application and Preliminary Decision for Class 3 modifications of
non-hazardous industrial solid waste permits;
(6) 30 days after the mailing of the notice
of draft production area authorization under Chapter 331 of this title
(relating to Underground Injection Control);
(7) the time specified in commission rules
for other specific types of applications; or
(8) as extended by the executive director for
good cause.
(b) The
public comment period shall automatically be extended to the close of any
public meeting.