31 Tex. Admin. Code § 15.21 - General Provisions on Certification of Local Government Dune Protection and Beach Access Plans
(a) Implementation
of conditionally certified plans. Local governments are required to implement
conditionally certified plans consistent with the Texas Natural Resources Code,
Chapters 61 and 63, and the General Land Office rules for management of the
beach/dune system, §§
15.1-
15.1 0 of this title (relating to
Management of the Beach/Dune System).
(b) Removal of conditions of certification.
(1) Local governments shall submit their
modified plans on or before the expiration of the 180-day time period. The
General Land Office shall provide to the pertinent local government a
determination as to the sufficiency of the modification(s) within 60 days of
receipt of the plan. The General Land Office will remove all conditions of the
plan's certification by amending the section in this subchapter that documents
the status of the specific local government's plan. If the General Land Office
determines that modifications of plans are insufficient, the General Land
Office shall provide specific exceptions to the modifications. If those
portions of the plan to which the General Land Office has noted exceptions can
be addressed through further comment, plan revision and review, conditional
certification will be reissued pursuant to a General Land Office amendment to
the local government's section which documents the certification status of the
local government's plan, subject to further plan modification.
(2) In the event that a local government
chooses not to modify its plan as requested in the General Land Office
comments, the local government shall provide in writing the scientific or legal
justification as to why such modifications are not feasible. The justification
shall be submitted to the General Land Office on or before the due date of the
revised plan. The justification will be reviewed by the General Land Office,
and a determination as to the sufficiency of the justification will be provided
to the local government within 60 days of receipt by the General Land Office.
Local government plans shall continue in effect under conditional certification
until the sufficiency of the justification is resolved or the section
documenting the certification status of the local government plan is
amended.
(c) Withdrawal
of conditional certification. Conditional certification of a local government
plan shall be withdrawn by the General Land Office after the 180-day time
period if the pertinent local government does not submit to the General Land
Office either a formally adopted plan which has been modified consistent with
General Land Office comments or the written scientific or legal justification
as to why such modification is not feasible. In any event, withdrawal of
conditional certification shall only occur after the General Land Office adopts
an amendment withdrawing conditional certification to the section that
documents the certification status of the local government plan, with
accompanying specific reasons, and the General Land Office has given the
pertinent local government written notice of the withdrawal of the conditional
certification.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.