Utah Admin. Code R307-223-3 - Requirements
(1) Each incinerator owner or operator
subject to R307-223 must comply with the requirements of 40 CFR 60.1540 and 60.1585 through 60.1905, and with the requirements and schedules set forth in
Tables 2 through 8 that are found following 40 CFR 60.1940 for operator
training and certification, operating requirements, emission limits, continuous
emission monitoring, stack testing, other monitoring requirements, record
keeping, and reporting. These provisions and table, effective as of the date
referenced in
R307-101-3,
are adopted and incorporated by reference with the exceptions listed below.
(a) In 40 CFR 60.1650(a), delete "or
state."
(b) In 40 CFR 60.1675(a),
delete "or a current provisional operator certification from your State
certification program."
(2) Compliance dates. Each
incinerator must be in compliance with the dates in Section III of the
Plan.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.