Utah Admin. Code R311-203-3 - New Installations, Permits
(1) Certified UST installers must notify the
director at least ten business days, or another time period approved by the
director, before commencing any of the following activities:
(a) the installation of a full UST system or
tank only;
(b) the installation of
underground product piping for one or more tanks at a facility, separate from
the installation of one or more tanks at a facility;
(c) the internal lining of a
previously-existing tank;
(d) the
installation of a cathodic protection system on one or more previously-existing
tanks at a facility;
(e) the
installation of a bladder in a tank;
(f) any retro-fit, replacement, or
installation that requires the cutting of a manway into the tank;
(g) the installation of a spill prevention or
overfill prevention device;
(h) the
installation of a leak detection monitoring system; or
(i) the installation of a containment sump or
under-dispenser containment.
(2) The UST installation company must submit
to the director an UST installation permit fee of $200 when any of the
activities listed in Subsections R311-203-3(1)(a) through R311-203-3(1)(f) is
performed on an UST system that has not qualified for a certificate of
compliance before the commencement of the work.
(3) The fees assessed under Subsection
19-6-411(2)(a)(i)
will be determined based on the number of full UST installations performed by
the installation company in the 12 months previous to the fee due date.
(a) installations for which the fee assessed
under Subsections
19-6-411(2)(a)(ii)
and R311-203-3(3) is charged shall count toward the total installations for the
12-month period.
(4) For
the purposes of Subsections
19-6-411(2)(a)(ii),
19-6-407(1)(c),
and R311-203-2(4), an installation is considered complete when:
(a) in the case of installation of a new UST
system, tank only, or product piping only, the new installation first holds a
regulated substance; or
(b) in the
case of installation of the components listed in Subsections R311-203-3(1)(d)
through R311-203-3(1)(f), the new installation is functional and the UST holds
a regulated substance and is operational.
(5) If, before completion of an installation
for which an UST installation permit fee is required, the owner or operator
decides to install additional UST system components, the installer shall notify
the director of the change.
(a) when additions
are made, the UST installation permit fee shall be increased based on the
additional number of tanks to be installed in accordance with Subsection
19-6-411(2)(a)(i)
and the Department of Environmental Quality Fee Schedule, as approved annually
by the Legislature.
(6)
The number of UST installation companies performing work on a particular
installation will not be a factor in determining the UST installation permit
fee for that installation.
(a) each
installation company must be identified on the UST installation
permit.
(7) When a new
UST system, tank only, product piping only, or new cathodic protection system
is installed, the owner or operator must submit to the director an as-built
drawing that meets the requirements of Subsection R311-200-1(2)(b).