Within 60 days of completion of closure of each hazardous
waste surface impoundment, waste pile, land treatment, and landfill unit, and
within 60 days of completion of final closure, the owner or operator shall
submit to the Director, by registered mail, a certification that the hazardous
waste management unit or facility, as applicable, has been closed in accordance
with the specifications in the approved closure plan. The certification shall
be signed by the owner or operator and by a qualified Professional Engineer.
Documentation supporting the Professional Engineer's certification shall be
furnished to the Director upon request until he releases the owner or operator
from the financial assurance requirements for closure under Subsection
R315-265-143(h).
Notes
Utah Admin. Code R315-265-115
Adopted by
Utah
State Bulletin Number 2019-21, effective
10/15/2019