Utah Admin. Code R315-319-60 - Location Restrictions
Placement above the uppermost aquifer.
(a) New CCR landfills, existing and new CCR
surface impoundments, and all lateral expansions of CCR units shall be
constructed with a base that is located no less than 1.52 meters, five feet,
above the upper limit of the uppermost aquifer, or shall demonstrate that there
will not be an intermittent, recurring, or sustained hydraulic connection
between any portion of the base of the CCR unit and the uppermost aquifer due
to normal fluctuations in groundwater elevations, including the seasonal high
water table. The owner or operator shall demonstrate by the dates specified in
Subsection R315-319-60(c) that the CCR unit meets the minimum requirements for
placement above the uppermost aquifer.
(b) The owner or operator of the CCR unit
shall obtain a certification from a qualified professional engineer stating
that the demonstration meets the requirements of Subsection
R315-319-60(a).
(c) The owner or
operator of the CCR unit shall complete the demonstration required by
Subsection R315-319-60(a) by the date specified in either Subsection
R315-319-60(c)(1) or (2).
(1) For an existing
CCR surface impoundment, the owner or operator shall complete the demonstration
no later than October 17, 2018.
(2)
For a new CCR landfill, new CCR surface impoundment, or any lateral expansion
of a CCR unit, the owner or operator shall complete the demonstration no later
than the date of initial receipt of CCR in the CCR unit.
(3) The owner or operator has completed the
demonstration required by Subsection R315-319-60(a) when the demonstration has
been submitted to and has received approval from the Director and is placed in
the facility's operating record as required by Subsection
R315-319-105(e).
(4) An owner or
operator of an existing CCR surface impoundment who fails to demonstrate
compliance with the requirements of Subsection R315-319-60(a) by the date
specified in Subsection R315-319-60(c)(1) is subject to the requirements of
Subsection R315-319-101(b)(1).
(5)
An owner or operator of a new CCR landfill, new CCR surface impoundment, or any
lateral expansion of a CCR unit who fails to make the demonstration showing
compliance with the requirements of Subsection R315-319-60(a) is prohibited
from placing CCR in the CCR unit.
(d) The owner or operator of the CCR unit
shall comply with the recordkeeping requirements specified in Subsection
R315-319-105(e), the notification requirements specified in Subsection
R315-319-106(e), and the internet requirements specified in Subsection
R315-319-107(e).
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.