Utah Admin. Code R317-5-8 - Final Inspection and Authorization to Use
Upon completion of construction, but before backfilling, the system designer must notify the division of completion and schedule a final inspection with the division. Where the local health department has the authority to issue operating permits they shall be included in the final inspection. The final inspection shall meet the requirements of Section R317-4-8. No wastewater may be introduced into a LUWD system until an authorization to use has been issued by the division.
The following documents, sealed by the engineer, must be provided to the division in order to receive authorization to use: