Utah Admin. Code R317-801-5 - SSMP Requirements
5.1 SSMP. The
permittee shall have and implement a written SSMP and shall make it available
to DWQ upon request. A copy of the SSMP shall be publicly available at the
permittee's office and/or available on the Internet. The SSMP must be publicly
noticed by the permittee and approved by the permittee's governing body at a
public meeting. The main purpose of the SSMP is to provide a plan and schedule
to properly manage, operate, and maintain all parts of the sewer collection
system to reduce and prevent SSOs, as well as minimize impacts of any SSOs that
occur.
5.2 Contents of SSMP. The
SSMP shall include:
(1) Organization
information to include:
(a) The name or
position of the responsible or authorized representative;
(b) The names and telephone numbers for
management, administrative, and maintenance positions responsible for
implementing specific measures in the SSMP. The SSMP must identify lines of
authority through an organization chart or similar document with a narrative
explanation; and,
(c) The chain of
communication for reporting SSOs, from receipt of a complaint or other
information, including the person responsible for reporting SSOs to DWQ, the
public (if needed) and other agencies if applicable (such as County Health
Department).
(2) Sewer
collection system use ordinances, service agreements, or other legally binding
methods, that:
(a) Prohibit unauthorized
discharges into its sewer collection system i.e. I/I, stormwater, chemical
dumping, unauthorized debris and cut roots;
(b) Require that sewers and connections be
properly designed and constructed;
(c) Ensure access for maintenance,
inspection, or repairs for portions of the laterals owned or maintained by the
permittee;
(d) Limit the discharge
of FOG and other debris that may cause blockages;
(e) Require compliance with pretreatment
requirements;
(f) Provide authority
to inspect industrial users; and,
(g) Provide for enforcement for violations of
the requirements.
(3) An
Operations and Maintenance Plan which includes:
(a) An up-to-date map of the sewer collection
system, showing all gravity line segments, manholes, pumping facilities,
pressure pipes, gates and all other applicable conveyance facilities;
(b) A description of routine preventative
operation and maintenance activities by staff and contractors, including a
system for scheduling regular maintenance and cleaning of the sewer collection
system with more frequent cleaning and maintenance targeted at known problem
areas. The plan should include regular visual and TV inspection of manholes and
sewer pipes and a system of ranking the condition of sewer pipe and manholes.
The plan should have an appropriate system to document scheduled and all other
types of work activities, such as a maintenance, management, system, or paper
work orders;
(c) A Rehabilitation,
Replacement and Improvement Plan to identify and prioritize system deficiencies
and implement short-term and long-term rehabilitation actions to address each
class of deficiencies. Rehabilitation and replacement should focus on sewer
pipes that are at risk of failure or prone to more frequent blockages due to
pipe defects. The rehabilitation and replacement plan shall include a CIP, if
required, that addresses proper management and protection of the infrastructure
assets;
(d) Schedule for training
on a regular basis for staff and contractors in operations and maintenance
consistent with DWQ continuing education requirements for certified operators;
and,
(e) Providing for equipment
and replacement part inventories, including identification of critical
replacement parts. (This may include a list of vendors that the equipment
and/or part can be purchased from, or local agreements).
(4) Design and performance provisions which
include:
(a) Design, construction standards
and specifications that meet or exceed R317-3 for the installation of new sewer
collection systems, pump stations and other appurtenances and for the
rehabilitation and repair of existing sewer collection systems; and,
(b) Procedures and standards for inspecting,
testing and documenting the installation of new sewers, pumps, and other
appurtenances and for rehabilitation and repair projects.
(5) A SORP which has the following measures
to protect public health and the environment:
(a) A program to respond to overflows which
addresses:
1. Receipt and documentation of
information regarding a sewer overflow;
2. Dispatch of appropriate crews to the site
of the sewer overflow;
3. Overflow
correction, containment, and cleanup including procedures to ensure that all
reasonable steps are taken to contain and prevent the discharge of untreated
and partially treated wastewater to Waters of the state and to minimize or
correct any adverse impact on the environment resulting from the sewer
overflow;
4. Preparation of an
overflow report by responding personnel; and,
5. Follow up with affected persons,
(b) Procedures for prompt
notification to the public.
(c)
Procedures to notify appropriate regulatory agencies and other potentially
affected entities to include:
1. DWQ to
comply with SSO reporting requirements;
2. County Health Department, local water
supply agencies as appropriate, and other affected agencies should the SSO
potentially affect the public health or reach the Waters of the
state;
3. Utah Division of
Emergency Response and Remediation, if hazardous materials are or may be
involved; and,
4. Any other
required UPDES, State, or Federal reporting requirements.
(d) Procedures to ensure that appropriate
staff personnel are aware of and follow the SORP and are appropriately
trained.
(6) For
permittees with 2000 or more connections, and at the option of permittees with
less than 2000 connections, a FOG control plan consistent with the potential
for FOG discharge from commercial and industrial dischargers. Where required,
the FOG control plan shall include some or all of the following:
(a) An implementation plan and schedule for a
residential and commercial public education outreach for the FOG control plan
that promotes proper disposal of FOG;
(b) A plan for the disposal of FOG generated
within the permittee's service area. This may include a list of acceptable
disposal facilities and/or additional facilities needed to adequately dispose
of FOG;
(c) Sewer collection system
use ordinances, service agreements, or other legally binding methods, that
prohibit FOG discharges to the system;
(d) Requirements to install grease removal
devices (such as traps or interceptors), design standards for the removal
devices, maintenance requirements, BMP requirements, record keeping and
reporting requirements;
(e) A FOG
inspection, monitoring and evaluation plan;
(f) Identification of resources to do
inspections and enforce the FOG control plan; and,
(g) A maintenance schedule for lines affected
by FOG blockages.
(7)
For permittees with 2000 or more connections, and at the option of permittees
with less than 2000 connections, a SECAP. Where required, the SECAP shall
include the following:
(a) an evaluation of
the wastewater collection system's existing hydraulic capacity using historical
information such as flow, system records, current zoning, local development
options, and maintenance records;
(b) identification of system deficiencies;
and,
(c) a CIP that includes an
appropriate model for the system that can be used to evaluate the hydraulic
conditions in the system and identify existing and forecast future deficiencies
to provide hydraulic capacity such as for future dry weather peak flow
conditions, as well as the appropriate design for storm or wet weather events.
The CIP shall establish a short and long term schedule to address the
deficiencies and conditions identified, including a priority list, alternative
analysis, and schedule for recommended upgrades. The CIP shall include
increases in pipe size, I/I reduction plans, increases in pumping capacities
and/or redundancies, storage capacity increases and recommended trunk line
cleaning schedules or other monitoring activities. The CIP shall identify the
sources of funding. The schedule shall be reviewed and adjusted
yearly.
5.3
Monitoring, Measurement, and SSMP Modifications.
(1) The permittee shall maintain relevant
information that can be used to establish and prioritize appropriate SSO
prevention activities and shall document all monitoring activities (i.e. daily
cleaning activities, CCTV video records, manhole inspections, and hot spot
activities).
(2) The permittee
shall regularly review the effectiveness of each element of the SSMP and shall
monitor the SECAP implementation (when required).
(3) The permittee shall annually assess the
success of the operation and maintenance plan (i.e. line cleaning, CCTV
inspections and manhole inspections, and SSO events) and adjust the operation
and maintenance plan as needed based on system performance.
(4) The permittee shall update SSMP elements,
as appropriate, based on monitoring or performance evaluations.
(5) The permittee shall regularly identify
and illustrate SSO trends, including frequency, location, and volume.
(6) The permittee shall conduct periodic
internal audits, appropriate to the size of the system and the number of SSOs.
At a minimum, these audits must occur every five years and a report must be
prepared and kept on file. This audit shall focus on evaluating the
effectiveness of the SSMP and the permittee's compliance with the SSMP,
including identification of any deficiencies in the SSMP and steps to correct
them.
(7) The permittee is
encouraged to communicate with the public, as needed, on the development,
implementation, and performance of the SSMP. The permittee may establish a
public outreach/communication plan which shall provide the public with the
opportunity to provide input to the permittee as the SSMP is developed and
implemented.
(8) The SSMP shall be
prepared by, or under the direction of, a Utah certified professional engineer
or another qualified professional.
(9) The SSMP must be completed by the
deadlines listed in the Timeframe for Implementation in
R317-801-6.