Utah Admin. Code R649-3-18 - On-site Predrill Evaluation
1. An
on-site predrill evaluation of drilling operations located on state or private
land shall be scheduled and conducted by the division prior to approval of an
APD and no later than 30 days after receipt by the division of a complete APD.
1.1. An on-site predrill evaluation may be
performed by the division prior to submittal of a complete APD at the written
request of the operator.
1.2. The
division, the operator, and other persons associated with the surface
management or construction of the well site shall attend the predrill
evaluation.
1.3. When appropriate,
the operator's surveyor and archaeologist may also participate in the predrill
evaluation.
1.4. When the surface
of the land involved is privately owned, the operator shall include in the APD
the name, address, and telephone number of the private surface owner as shown
on the property records of the county where the well is located.
1.5. The surface owner shall be invited by
the division to attend the predrill evaluation.
1.6. The surface owner's inability to attend
the predrill evaluation shall not delay the scheduled
evaluation.
2. Special
stipulations concerning surface use or justifications for well spacing
exceptions may be addressed and developed at the predrill evaluations.
2.1. Special stipulations shall be
incorporated as conditions of the approved APD, together with any additional
conditions determined by the division to be necessary following a review of the
complete application.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.