Utah Admin. Code R652-50-1100 - Range Improvement Projects
1. Range
Improvement Projects shall be submitted for approval on appropriate application
forms. Range Improvement Projects shall be approved or denied by the division
based on a written finding.
2. All
range improvement activity shall be approved by the division in writing before
construction begins. Line cabins and similar structures shall not be authorized
as range improvement projects and shall be authorized by a special use lease
pursuant to R652-30.
3. Division
authorization for range improvement projects shall be valid for periods of time
not to exceed two years from the date the applicant is notified of the
authorization. Extensions of time may be granted only in extraordinary
circumstances.
4. Range
improvements constructed or placed upon sovereign land without prior approval
shall become the property of the division.
5. Range improvements shall not be authorized
if they would be:
(a) located on a parcel that
the division has determined has potential for sale, lease or exchange and the
possibility exists that improvements may encumber these actions.
(b) located on a parcel designated for
disposal by division action or through the comprehensive management planning
process.
(c) a project or structure
that does not fill a critical need or enhance the value of the
resource.
6. Range
improvements which are necessary to rehabilitate lands whose forage production
has been diminished by poor grazing practices or poor stewardship of the
permittee shall not be considered a reimbursable improvement but rather a
requirement to keep the grazing permit in effect.
7. Authorized Range Improvement Projects
shall be depreciated using schedules consistent with typical schedules
published by the USDA Soil Conservation Service. In the event of disposal of
the property, the issuance of a permit to a competing applicant, or withdrawal
of the property, the permittee shall receive no more than the original cost
minus the indicated depreciation costs; or in the alternative, shall be allowed
90 days to remove improvements pursuant to section
65A-7-6(6).
8. If the range improvement project is
designed to increase carrying capacity, the permittee shall agree to pay for
the increase in AUMs annually starting no later than two years after project
completion. The division may allow any increase in fees to be phased-in at 20%
per year.
9. The division may
participate in cost-sharing of designated range improvement projects, or
maintenance of existing range improvement projects, by providing funding in
amounts and at rates determined by the division.
10. The division's cost/share portion of the
project may be in the form of project materials. In these instances, the
permittee shall be required to provide all necessary equipment and manpower to
complete the project to specifications required by the division.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.