Utah Admin. Code R653-10-4 - Applications for Grants
(1)
(a) To obtain a grant under this rule, an
applicant shall submit an application with the division.
(b) If grant funding described in Subsection
R653-10-1(1)
remains after the first round of applications and grant disbursements, the
board may designate one or more additional application periods to ensure the
entire funding amount is awarded by December 31, 2024.
(2) An application submitted to the division
shall include:
(a) a detailed project cost
estimate, including engineering fees, meter costs, and installation
costs;
(b) the total number of
pressurized secondary water connections in the applicant's secondary water
system;
(c) the number of meters to
be installed under the grant;
(d)
detailed estimated secondary water use information, including:
(i) average lot size;
(ii) average irrigated acreage; and
(iii) estimated secondary water usage before
the project versus after completion of the project;
(e) the timeline for purchase and
installation of meters under the project, including the projected start date
and expected completion date;
(f)
estimated need for additional water and timeline for anticipated
shortages;
(g) project plans and
specifications---stamped and signed by the Utah licensed professional engineer
responsible for the project;
(h) an
agreement to:
(i)
(A) provide an educational component
promoting water conservation on a monthly water use statement provided to the
applicant's secondary water customers; or
(B) bill according to usage based on a tiered
conservation rate; or
(C) provide
both an educational component on water conservation and bill based on a tiered
conservation rate; and
(ii)
(A)
commit project grant funds through contract no later than December 31, 2024;
and
(B) spend all project grant
funds and complete construction of the project no later than December 31,
2026;
(i)
applicant's verification that the information provided in the application is
accurate and any estimates or projections submitted are based on sound
professional judgement and the best available data; and
(j) additional information required on the
application.