Utah Admin. Code R655-12-3A - Content of Initial Filling Plans
Initial filling plans should include the following information:
1. The rate, in vertical
feet per day, that the reservoir should be filled or drawn down. Instructions
on what steps should be taken in the event inflow exceeds the established rate.
Rates and criteria can vary with reservoir elevation.
2. The frequency at which the dam will be
observed or inspected and who is responsible. A checklist should be provided so
critical features are observed.
3.
The frequency at which all instrumentation is to be read and how the readings
are to be distributed to interested parties. Predicted performance of
instrumentation should be included and a reporting procedure established to
review unexpected readings in a timely manner.
4. Reference to the Emergency Action Plan
should be given so the inspector or engineer understands emergency procedures
and contacts to be made when unusual conditions, or possible failure, are
observed.
5. A procedure should be
outlined whereby the data and observations obtained following the first cycle
of filling can be included to supplement or modify the Standard Operating
Plan.
6. The Initial Filling Plan
should include a requirement that any project features that did not function as
designed must be re-evaluated with provisions for mitigation work provided when
necessary.