Utah Admin. Code R661-25-501 - Required Documentation for Housing Projects
(1) A Navajo Nation Homesite Lease will be
required of all new house construction and construction completion
projects.
(2) For other types of
Housing Assistance applicants are strongly encouraged to have a homesite lease
available for proof of ownership, utilities and other services.
(3) Matching fund agencies shall be
identified and commitment letters from each agency shall be included in the
proposal package.
(4) Applicants
must provide documentation naming a successor owner/lessee who is permitted to
occupy the residence and is obligated to maintain the property.
(5) All new construction must be based on a
floor plan showing all components of the dwelling unit to be constructed.
Additionally, a specific list of all materials to be used and an estimate of
total man-hours for construction is required.
(6) Proof of the applicants contribution
towards the construction, addition, or renovation of a dwelling in the form of
receipts for the purchase of cement as well as proof of purchase of adequate
waterproof material for protection from moisture damage to the bags of cement
purchased.