Utah Admin. Code R940-5-5 - Review of the Qualifications and Financial Resources of the Proposer
(1) An application
must include specific qualifications and details, including the requirements
outlined in Subsection
72-6-303(3) in
addition to requirements outlined in Rule R926-16 Unsolicited Proposals for
Transportation Infrastructure Public-Private Partnerships.
(2) The Department will review each
application to ensure compliance with Subsection
72-6-303(3) and
Section 63G-6a-712 in addition to
requirements outlined in Rule R926-16.
(3) As part of the review of a proposed plan
to construct a highway facility over sovereign lakebed lands, the Department
and Commission will consider the public interest to ensure the proposed plan is
feasible, financially viable, and that the facility is safe by meeting current
engineering standards.
(4) The
Commission may require or permit the proposer to submit revisions or
clarifications or supplement the application during the review
process.
(5) The Commission shall
consider recommendations made by the Department, including whether the highway
construction plan contained within the application meets engineering and design
standards outlined in an agreement entered into by the Department and the
Proposer.
(6) The Commission may,
in its sole discretion, refuse to review an application if the proposal fails
to meet the guidelines established in Section
72-6-303 and this rule.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.