14-001 Code Vt. R. 14-020-001-X - RULES AND REGULATIONS ON BETTERMENT PROJECTS
Rules and Regulations on Betterment Projects
8.1 The purpose of this rule is to set out
criteria t [to] be used by the Agency of Transportation to select small
betterment projects as provided in ยง
6 of
Act No. 186 of the adjourned session of the 1985 Legislature. The intent of the
program is to correct spot deficiencies generally not listed on the Five Year
Transportation Construction Program by allocating monies for the construction
of small betterment projects generally costing less than $ 100,000 each.
8.2. Chief Engineer is the Director of
Engineering an Construction for the Agency of Transportation.
8.3. Projects will be nominated by the
District Transportation Administrators through the Director of Maintenance.
Each district will forward its three highest priority projects annually.
Submittal shall include a description of the proposed improvement and the
estimated cost. Projects may be on either the state or town system where
preference shall be given to projects on the Class I and numbered Class II town
highways.
8.4. Proposed projects
will be reviewed by the Planning Division of the Agency and a list of candidate
projects will be compiled using the following criteria as guide:
a. Geographical distribution of projects,
including prior years' projects;
b.
cost estimates - preference given to projects costing less than $
100,000;
c. traffic volumes on
selected highway;
d. accident
record on selected highway;
e.
hazard or problem eliminated - does work eliminate a need for a bigger project
in the near future?
8.5.
The list of candidates will be reviewed by the Chief Engineer. The Agency will
be free to select projects from anywhere on list of candidate projects and is
not limited to the order in which projects are listed.
All projects must have plans or sketches approved by the Chief Engineer detailing the work to be accomplished prior to construction.
8.6. The final list of projects
prepared by the Chief Engineer must be approved by the Secretary of the
Agency.
8.7. While neither major
surveys, major design efforts, substantial right-of-way acquisitions and
multiple permits should be necessary for these betterment projects, these
requirements are not waived and if compliance is applicable, they are
required.