30-007 Code Vt. R. 30-000-007-X - POLE ATTACHMENTS (3.700)
Section
3.701 Applicability and General Provisions
(A) This Rule governs the
attachment of lines, wires, cables, or other facilities by any
Attaching Entity seeking to attach to a pole owned by a Pole-Owning
Utility, at rates, terms, and conditions that are just and
reasonable. This Rule applies to poles used in the distribution
system used to serve customers, and not to poles used as part of a
company's transmission system. In applying this Rule, the Board shall
consider the interests of entities seeking or having attachments,
Pole-Owning Utilities, and the customers of each.
(B) Except as specifically
provided, nothing in this Rule shall be construed to confer a right
upon any Attaching Entity to alter, move, or otherwise perform work
upon facilities owned by another Attaching Entity or by a Pole-Owning
Utility.
(C) Except as
specifically provided, nothing in this Rule shall be construed to
supersede, overrule, or replace any applicable safety code (including
the National Electrical Safety Code [NESC]) or safety rules, VOSHA
regulations, any other law or regulation, tariffs and protocols
approved by the Board, nor the reasonable engineering standards and
good-faith work practices of any Attaching Entity or Pole
Owner.
Section
3.702 Definitions
(A)
Access means physical access to poles and rights-of-way necessary and
sufficient to allow connection of cables and other appurtenances by
an Attaching Entity, and to inspect, maintain, and repair such cables
and other appurtenances.
(B) Attaching Entity means an
entity holding a certificate of public good from the Board, or a
Broadband Service Provider, that seeks to attach a facility (or has
attached a facility) of any type to a pole or right-of-way for the
purpose of providing service to one or more customers, including but
not limited to telecommunications providers, cable television service
providers, incumbent local exchange carriers, competitive local
exchange carriers, electric utilities, and governmental
entities.
(C) Broadband
Service Provider means an entity authorized to do business in the
state of Vermont that seeks to attach facilities that ultimately will
be used to offer Internet access to the public. Wireless Broadband
Service Providers must hold an FCC license or use equipment that
complies with applicable FCC requirements [n1]. A Broadband Service
Provider who does not hold a certificate of public good from the
Board must, before availing itself of the provisions of this Rule,
file with the Board and with any affected Pole-Owning Utility an
affidavit that sets forth the Provider's name, form of legal entity,
contact information, agent for service of process, proposed general
area of service, proof of insurance, and a representation that the
Provider will abide by the terms and conditions of this Rule and any
applicable pole attachment tariffs, including any protocols filed
pursuant to section 3.708(K) of this Rule and Orders issued by the
Board.
[n1. See 47 C.F.R. Part 15.]
(D) Core Services means the
original regulated business of a utility company. For example, the
Core Service of an electric utility is the provision of electric
service, but not the provision of telephone or cable television
service.
(E) Make-ready
means work necessary to make a pole available for attachment of
additional facilities.
(F) Pole Attachment or Attachment
means an attachment or addition by an Attaching Entity to a pole or
right-of-way.
(G)
Pole-Owning Utility means a company, as defined in
30 V.S.A. §
201, that is subject to regulation
by the Board, and that has an ownership interest in utility poles or
rights-of-way.
Section
3.703 Tariff Required
(A) Each Pole-Owning Utility shall
file a pole attachment tariff with the Board. The tariff shall
include rates, terms, and conditions governing attachment to poles
and rights-of-way in which the Pole-Owning Utility has an ownership
interest.
(B) The tariff
may incorporate a standard contract or license for attachments, so
long as it is available to any Attaching Entity within the scope of
this Rule and its provisions are not contrary to the provisions of
this Rule.
(C) The tariff
may include terms that are just and reasonable subject to approval by
the Board, and it may include limitations on liability,
indemnification, insurance requirements, and restrictions on access
to Pole-Owning Utility facilities.
(D) Tariff provisions filed under
this section shall not supercede the terms of any applicable
contract.
Section
3.704 Contracts for Cost, Maintenance, and Use of Poles
(A) Contracts Authorized.
Pole-Owning Utilities and Attaching Entities may enter contracts
concerning the cost, maintenance, and use of poles.
(1) Any contract purporting to take
effect after the effective date of this Rule shall be submitted to
the Board for review pursuant to
30 V.S.A. §
229.
(2) Unexpired contracts on the
effective date of this Rule between Attaching Entities and
Pole-Owning Utilities shall remain in effect until they expire
according to their terms.
(B) Investigations. The Board may
investigate the terms and rental rate of any proposed or existing
contract between Attaching Entities and Pole-Owning Utilities. Where
the public interest so requires, the Board may order that terms or
rates be modified.
(C)
Expiring Contracts. When a pole attachment contract has expired or is
about to expire, and an Attaching Entity cannot reach agreement on a
rental rate with the Pole-Owning Utility, any party may petition the
Board to set an attachment rate. In reaching a decision the Board may
consider the terms and conditions of previous contracts between the
parties and the rental calculation in section 3.706.
(D) Public Records. A pole
attachment contract in the possession of the Board is a public record
unless the Board orders otherwise, for good cause shown.
Section 3.705 Joint
Ownership of Poles
(A) Joint
Ownership. Two or more utilities may own poles jointly. The cost,
maintenance, and use of such poles may be controlled by a contract
under section 3.704 and shall be reviewed as required under that
section.
(B) Shared
Revenue. Unless otherwise provided by contract, each owner of a
jointly-owned pole shall receive rental payment from each Attaching
Entity in accordance with its ownership interest.
Section 3.706 Rental
Calculation
(A) Scope. This section
establishes pole attachment rates for inclusion in the tariffs of
Pole-Owning Utilities.
(1) Unless
the Board rules to the contrary in a particular case, rates under
this section do not apply where the rights of the Attaching Entity
and the Pole-Owning Utility are defined by a contract (including a
Joint Ownership Agreement or Joint Use Agreement).
(2) Where an electric utility or an
incumbent local exchange carrier cannot reach agreement on a rental
rate with the Pole Owner, either party may petition the Board to set
a rate. The Board may consider the terms and conditions of any
previous attachment or joint-use contracts between the parties in
setting a rate not inconsistent with the principles of this
Rule.
(B)
Single Rate. Each Pole-Owning Utility shall calculate a single pole
rental rate and shall include that rate in its pole attachment
tariff.
(C) Rental Charge
Formula. The annual rental rate per pole shall be calculated using
the following formula:
Click here to view image
(D) Definitions.
(1) Except where otherwise
controlled by contract, "Space Occupied by Attachment" is defined as
follows.
(a) If the Pole-Owning
Utility has conducted a study of the space actually occupied by a
particular type of attachment (including safety space) on the
Pole-Owning Utility's poles, then an amount defined in a tariff, but
in no event less than the amounts specified in paragraph (b)
below.
(b) Otherwise, the
following quantities:
(i) 1.0 foot
for Attaching Entities that are cable television operators and that
do not provide local exchange telephone service; and
(ii) 2.0 feet for all other
Attaching Entities except incumbent local exchange carriers and
electric utilities.
(2) "Total Usable Space" is defined
as follows.
(a) If the Pole-Owning
Utility has conducted a study of its average pole height, total
usable space means the Pole-Owning Utility's average pole height less
the unusable space on the pole. Any study may be based upon plant
records or field inspections. Poles not suitable for bearing an
Attaching Entity's attachments shall be excluded. The forty-inch safe
space below the electric attachments, as required by the National
Electrical Safety Code, shall be counted as usable space.
(b) "Unusable space" shall mean the
6 feet buried in the ground plus the first 18 feet above ground and
below the first attachment, unless the Pole-Owning Utility has
conducted a study of the actual average amount buried or the
clearance above ground below the first attachment.
(c) Otherwise, total usable space
shall be 16 feet, which is based upon a presumed pole height of 40
feet, less 24 feet presumed unusable space.
(3) "Net Investment per Pole" is
that part of pole account attributable to poles physically located in
Vermont, and adjusted for depreciation and deferred taxes. This net
amount is then divided by the number of poles owned by the
Pole-Owning Utility in Vermont.
(4) "Carrying Cost Ratio" is the
allowable revenue for each dollar of net pole investment, taking into
account annual maintenance expense, depreciation, administrative
expense, taxes, and return on net investment.
(E) Associated Companies. A
Pole-Owning Utility that also engages in the provision of another
utility service or cable service shall impute to its costs of
providing such other services (and charge any affiliate, subsidiary,
or associated company engaged in the provision of such other
services) an amount equal to the pole attachment rate for which a
company providing such other service would be liable under this
section if it were not the pole owner.
Section 3.707 Non-exclusive Right
of Access
(A) Right of Access. A
Pole-Owning Utility shall provide all Attaching Entities
non-discriminatory access to any pole, support structure, or
right-of-way in which it has an ownership interest.
(1) A Pole-Owning Utility may deny
access for reasons of safety, reliability, or generally applicable
and accepted engineering standards.
(2) A Pole-Owning Utility may deny
access on a non-discriminatory basis where there is insufficient
capacity. Insufficient capacity shall not be a legitimate grounds for
denial of access where Make-ready work can be used to increase or
create capacity.
(3) A
Pole-Owning Utility may not favor itself over any Attaching Entity,
nor deny access based on a reservation of space for its own use.
However, a Pole-Owning Utility may favor itself when it has a need
for space on a pole or poles in order to provide its core service and
when it also has a bona fide development plan that shows a need for
additional attachments to the poles in question within three years of
the date of adoption of the plan; provided that the Pole-Owning
Utility may not so favor itself for more than three years in any
ten-year period.
(4)
Broadband Service Providers and wireless telephone providers shall be
authorized to have antennas installed within or above the electric
supply space. All such installations of Broadband Service Provider
and wireless telephone provider facilities on utility poles must
conform to the most recent edition of the NESC as well as the other
rules and practices in 3.701(C). Installation and maintenance work in
this area shall be done only by the electric utility or Outside
Contractors as provided in 3.708(G).
(5) Termination demarcation. An
Attaching Entity may designate one or more utility poles as its
customer interface location for purposes of utility service delivery
to the Attaching Entity.
(B) Exclusive Access Prohibited. No
utility, cable television system, or telecommunications carrier
subject to the Board's jurisdiction may enter into a contract with a
property owner that provides exclusive access to poles or
rights-of-way inside or upon commercial or residential
buildings.
(C) Burden. In
any proceeding before the Board or a court concerning a denial of
access to a pole or right-of-way, the party contending that access is
not available shall have the burden of making a prima facie
case.
Section
3.708 Applications for Attachment and Make-Ready Work
(A) Application. Applications for
attachment by an Attaching Entity to a Pole-Owning Utility shall be
submitted in writing.
(B)
Responsibility. During the Make-ready process, the Pole Owner is
presumed to have control of the pole and is responsible for meeting
all time limits in this section. Pre-existing Attaching Entities are
responsible for completing their work within a time that allows the
Pole Owner to comply with the requirements of this section.
(1) If the work on a pole is not
completed within the allowed time because of delays caused by another
entity attached to the pole, and the Pole Owner is liable for any
penalties or damages because of the delay, the Entity causing the
delay shall indemnify the Pole Owner for penalty or damages
paid.
(2) The allowed
time periods and deadlines in this section apply unless otherwise
agreed by the various parties, and except for extraordinary
circumstances and reasons beyond the Pole-Owner's control.
(3) If an application involves
poles owned by multiple owners, then the longest applicable time
limit applies.
(C) Initial Action and Survey. Any
required Make-ready survey is to be completed within the time period
set out in this subsection, starting from the date the completed
application is received, unless otherwise agreed by the parties. The
Make-ready survey period shall depend on the number of poles or
attachments involved, as a percentage of the total number of poles
owned. If a Pole-Owning Utility intends to deny access to poles under
3.707(A)(1),(2),or (3), it shall state with specificity the grounds
for the denial.
(1) Make-ready
survey work on fewer than 0.5% of a company's poles or attachments
shall be completed within 60 days.
(2) Make-ready survey work on 0.5%
or more but less than 3% of a company's poles or attachments shall be
completed within 90 days.
(3) Make-ready survey work on 3% or
more of a company's poles or attachments shall be completed within a
time to be negotiated between all the affected owners and attachers.
The time shall be negotiated in good faith and shall be reasonable in
light of subsections (1) and (2), above.
(D) Applicant's Authorization and
Payment. After completion of the Make-ready survey, the entity
seeking attachment shall authorize the Pole-Owning Utility to
complete Make-ready work and shall make all required advance
payments.
(1) Unless otherwise
agreed, Make-ready work, permits, inspection, and rearrangement costs
shall be based on a reasonable estimate of costs and shall be paid in
advance.
(2) The
Pole-Owning Utility's tariff may require prepayment, or other
reasonable assurance of credit worthiness, before performing the
Make-ready survey.
(3)
The costs of the Make-ready survey shall be payable even if the
entity decides not to go forward with construction of its
attachments.
(E) Time to Complete Make-ready.
The Pole-Owning Utility and Attaching Entities already attached to
the pole shall complete necessary Make-ready work within the periods
allowed by this section.
(1) The
Make-ready completion period shall depend on the number of poles or
attachments involved, as a percentage of the total number of poles
owned.
(a) Make-ready work on fewer
than 0.5% of a company's poles or attachments shall be completed
within 120 days of authorization and payment.
(b) Make-ready work on 0.5% or more
but less than 3% of a company's poles or attachments shall be
completed within 180 days of authorization and payment.
(c) Make-ready work on 3% or more
of a company's poles or attachments shall be completed within a time
to be negotiated between all the affected owners and attachers. The
time shall be negotiated in good faith and shall be reasonable in
light of subsections (a) and (b), above.
(2) Time shall be measured from the
later to occur of:
(a) receipt of
the authorization and payment (if any) under subsection (D);
and
(b) all applicable
state or municipal permits have been obtained. If the permitting
authority requires participation by the Pole-Owning Utility, the
latter shall act in good faith.
(F) Least Cost Methods. In
completing Make-ready work, a Pole-Owning Utility shall pursue
reasonable least-cost alternatives, including space saving techniques
currently relied upon by that utility; however, it shall at all times
maintain compliance with the National Electrical Safety Code, state
and local laws and regulations, and Pole-Owning Utility construction
standards.
(G) Outside
Contractors. All Pole-Owning Utilities and Attaching Entities shall
maintain a list of contractors whom they allow to perform Make-ready
surveys, Make-ready, installation or maintenance, or other specified
tasks upon their equipment. In the event that a Pole-Owning Utility
cannot perform such work in a timely manner, the Attaching Entity may
demand that outside contractors be sought. The Pole-Owning Utility
shall thereupon exercise best efforts to hire one or more contractors
from the list to perform such work, under the supervision and control
of the Pole-Owning Utility. If the Pole-Owning Utility is not an
electric utility and there are electric lines on the pole, the pole
owner shall provide the operator of the electric lines with advance
notice of the work to be done and shall allow the electric utility to
join or take over the supervision and control of the work of the
outside contractor.
(H)
Payments. After completion of Make-ready work, the applicant shall
pay the cost of all Make-ready work actually required for the
attachment that has not been pre-paid, or shall be refunded any
excess of the pre-payment not actually required.
(1) The applicant shall not be
responsible for any portion of the Make-ready expense that is
attributable to the correction of pre-existing violations, unless the
applicant has caused a portion of the violation.
(2) The costs of any modification
that is also specifically used by other existing Attaching Entities
shall be apportioned accordingly.
(3) Where a Pole-Owning Utility
currently relies upon one or more techniques referenced in subsection
(F) as part of its normal operating procedures but refuses to utilize
such techniques for the benefit of the entity seeking attachment,
that entity shall only be responsible for the cost that would have
been incurred had such techniques been utilized (provided such use
would have been in accordance with generally accepted engineering
practices).
(I) Overlashing. Any overlashing
must be done in accordance with generally accepted engineering
standards. The Attaching Entity shall give ten days' notice to the
Pole-Owning Utility before beginning such overlashing.
(1) No additional application or
payment is required for an Attaching Entity to overlash more of its
facilities to its existing attached facilities, unless it
necessitates additional costs such as guying or additional pole
strength, occupies additional attachment space on the pole, or
provides a different utility service than the existing
facilities.
(2) If the
new facilities deliver a utility service that ought to pay a higher
rental under this rule, the Attaching Entity shall begin paying the
higher rate.
(3) If the
new facilities are owned by someone other than the existing Attaching
Entity, then both shall pay rental, each at the rate designated by
this rule.
(J)
Lowest Attachment Point. No Attaching Entity shall be denied
attachment solely because the only space available for attachment on
a pole is below the lowest attached facility. If the owner of the
lowest facility wishes to relocate its existing facilities to a lower
allowable point of attachment so that the new Attaching Entity will
be above all existing facilities, the owner of such existing
facilities shall pay one-half of the cost of moving its
facilities.
(K)
Attachment Protocol. Each Pole-Owning Utility shall include in its
pole-attachment tariff required by section 3.703 a reasonable
protocol under which it will allow attachments by Broadband Service
Providers or wireless telephone providers in areas of its poles that
are not ordinarily used for attachments or for equipment that is
unusually large. Such protocol may include the provision of a
separate pole for the attachment of this equipment if:
(1) the proposed attachment cannot
be made to the existing pole consistent with 3.701(C);
(2) the separate pole is requested
by the attaching entity; or,
(3) the provision of the separate
pole is less expensive than the proposed attachment to the existing
pole.
Section
3.709 Notices from Pole-Owning Utility
(A) A Pole-Owning Utility shall
provide each Attaching Entity 60 days' written notice prior to:
(1) Removing facilities or
terminating service to those facilities, where that action arises out
of a rate, term, or condition of the pole attachment agreement;
or
(2) Increasing pole
attachment rates by contract or tariff.
(B) Unless otherwise agreed, a
Pole-Owning Utility shall provide an Attaching Entity 30 days'
written notice before modifying any of the Attaching Entity's
facilities. Less than 30 days' notice may be provided for routine
maintenance, modification in response to emergencies, or
modifications that are beyond the reasonable control of the
Pole-Owning Utility, provided that the notice is reasonable under the
circumstances and as prompt as practicable.
Section 3.710 Complaint Procedures
(A) A party aggrieved by a
violation of these rules may file a complaint or petition with the
Board. The Board shall take final action within 180 days after the
filing of the complaint or petition.
(B) An Attaching Entity aggrieved
by a proposed change to a Pole-Owning Utility's tariff may intervene
in any rate case following such a tariff filing.
Section 3.711 Effective
Date
This rule shall take effect on July 14, 2008. However, any new pole attachment tariffs required by the 2008 amendment need not take effect until September 1, 2008, and Pole-Owning utilities need to file new tariffs that will take effect on that date.
Notes
EFFECTIVE DATE: November 15, 1985 Secretary of State Rule Log #85-70
AMENDED: September 1, 2001 Secretary of State Rule Log #01-39; July 14, 2008 Secretary of State Rule Log #08-026
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.