12 Va. Admin. Code § 5-590-260 - Issuance of the operation permit
A. Upon receipt of the statement of
completion of construction, receipt of all required certifications and test
results, inspection by the department to ensure that the project has been
satisfactorily completed in accordance with the approved design documents, and
verification that bacteriological test results comply with the requirements set
forth in Part II of this chapter, as appropriate, the commissioner will issue
an operation permit.
B. The owner
shall not operate a waterworks without first having obtained an operation
permit except as provided in
12VAC5-590-290.
C. The commissioner shall establish the type
(community waterworks, NTNC, or TNC), classification, and permitted capacity of
the waterworks and specify these on the operation permit. Conditions may be
included with the permit for operator, monitoring, and reporting
requirements.
Notes
Statutory Authority: §§ 32.1-12 and 32.1-170 of the Code of Virginia.