Wash. Admin. Code § 173-182-522 - Planning standards for shoreline cleanup
(1) Each contingency plan shall include
procedures for identifying shoreline types that could be impacted by an oil
spill and procedures to determine appropriate response tactics for the
potentially impacted shorelines during spills. The plan should describe
contracted access to shoreline clean-up workers and shoreline clean-up
equipment to ensure the following capability can plan to arrive within
twenty-four hours of spill notification:
(a)
Plan holders must have contracted access to one hundred trained shoreline
clean-up workers. The shoreline cleanup workers must have appropriate safety
and Hazwoper training and will not be counted towards other planning standards.
The training should enable clean-up workers to safely perform clean-up actions
under the direction of the supervisors and the work assignment as developed by
the unified command.
(b) Plan
holders must have contracted access to trained shoreline clean-up supervisors.
Training for supervisors must include safety, Hazwoper, and relevant ICS
courses. For planning purposes a ratio of 1:10 supervisors to clean-up workers
should be available under contract to the plan holder. The shoreline clean-up
supervisors will not be counted towards other planning standards. Supervisors
must understand the ICS process and be able to direct workers consistent with
the work assignments as developed by unified command.
(c) Plan holders shall have access to
adequate equipment for passive recovery for three miles of shoreline on three
tide lines. The plan must identify the staging location(s) of the shoreline
clean-up equipment.
(d) The plan
holder must have access to a shoreline clean-up mobile storage cache that can
support eighty to one hundred shoreline clean-up workers with personal
protective equipment, hand tools, and other logistical support for three to
five days.
(2) Plan
holders must describe how data collection, communications, data transmission
and data management will be conducted.
(3) The plan shall describe how the plan
holder will obtain additional resources necessary to support fourteen
additional days of shoreline cleanup. The description should include vendor
names, contact information, resources, and approximate time frames for
resources to arrive at a staging area.
Notes
Statutory Authority: Chapters 88.46, 90.48, 90.56 RCW,