(1) Fluoride.
(a) The emission of total fluorides from a
primary aluminum reduction plant shall meet the requirements in 40 C.F.R.
63
Subpart LL.
(b) In addition to
meeting the requirements in (a) of this subsection, the emission of fluorides
from a primary aluminum reduction plant shall meet the requirements in chapter
173-481 WAC.
(c) If ecology has
reason to believe that adverse fluoride impacts are occurring, a primary
aluminum reduction plant must establish, in response to a request from ecology,
an ambient air and/or forage monitoring program approved by ecology as required
by WAC
173-481-150.
(2) Particulate. Facilities shall reduce the
total emission of particulate matter to the atmosphere from the reduction
process (potlines) to the lowest level consistent with reasonably available
control technology (RACT) for primary aluminum reduction plants. The emission
of solid particulate shall not exceed 7.5 grams per kilogram (fifteen pounds
per ton) of aluminum produced on a daily basis. Facilities shall calculate
aluminum produced using the method in
40 C.F.R.
63.847(e)(6) used for
determining aluminum production rate.
(3) Visible emissions. Visible emissions from
any emissions unit in a primary aluminum reduction plant shall not exceed an
average twenty percent opacity for more than six consecutive minutes in any
sixty-minute period. This provision shall not apply:
(a) When the presence of uncombined water is
the only reason for the opacity of the plume to exceed twenty percent;
or
(4) Fugitive emissions. Each primary aluminum
reduction plant shall use RACT to prevent fugitive emissions. Fugitive dust is
included in fugitive emissions.
(5)
Sulfur dioxide.
(a) Total emissions of sulfur
dioxide from all emissions units shall not exceed thirty grams of sulfur
dioxide per kilogram of aluminum produced on a monthly average (sixty pounds
per ton).
(b) In no case shall any
plant cause or permit the emission of a gas containing sulfur dioxide in excess
of one thousand parts per million corrected to dry standard conditions for an
hourly average.
(6)
Operation and maintenance (O&M). At all times, including periods of
abnormal operation and upset conditions, owners and operators shall, to the
extent practicable, maintain and operate an affected facility, including
associated air pollution control equipment, in a manner consistent with good
air pollution control practice. Determination of whether acceptable operating
and maintenance procedures are being used will be based on information
available to ecology, which may include, but is not limited to, monitoring
results, opacity observations, review of operating and maintenance procedures,
and inspection of the source. The means for demonstrating ongoing compliance
with good O&M may include, but not be limited to: More frequent source
testing, prescriptive procedures or inspections, control values for emissions
at values less than the applicable regulatory requirements and that function as
an investigative trigger rather than as a limit, collection and efficiency
requirements, or the use of CEMs.
(7) Source testing. To demonstrate compliance
with this chapter, the testing provisions of chapters
173-400,
173-481 WAC and
the requirements in 40 C.F.R. Part
63, Subpart LL shall be
applicable.
(8) Alternative
emission limitation. An owner or operator may request an alternative emission
limitation (as defined in WAC
173-400-030) under:
(a) WAC
173-400-081 for an action covered
under a notice of construction application; or