(1) A purveyor shall designate at least one
certified opera-tor in responsible charge to meet the requirements of WAC
246-292-032 and as required in
WAC
246-292-050(1), (2), and
(4), as applicable.
(2) A purveyor may designate additional
certified operators in responsible charge in accordance with WAC
246-292-050(3)
when a purveyor has designated operating shifts and major segments.
(3) A purveyor shall designate and report
mandatory certified operators in responsible charge positions to the department
within thirty days of:
(a) Starting
operations of a public water system; or
(b) When a mandatory certified operator in
responsible charge position is vacated.
(4) The purveyor shall not require certified
operators to perform an action or correction that is inconsistent with their
experience, skills, abilities, or level of certification.
Notes
Wash. Admin.
Code §
246-292-020
Amended by
WSR
14-01-003, filed 12/4/13, effective 1/4/2014
Statutory Authority: Chapter 70.119 RCW and Safe Drinking
Water Act, Public Law
104-182; 64 F.R. 5916 - 5921. 01-02-070, §
246-292-020, filed 12/29/00, effective 1/29/01. Statutory Authority: Chapter
70.119 RCW. 94-04-004, § 246-292-020, filed 1/20/94, effective 2/20/94.
Statutory Authority:
RCW
43.70.040. 91-02-049 (Order 121), recodified
as § 246-292-020, filed 12/27/90, effective 1/31/91. Statutory Authority:
RCW
70.119.050. 78-10-053 (Order 1343), §
248-55-030, filed 9/22/78.