007 Signs.
(1) The sign(s) required in NEC 701.7 must be
placed at the service disconnecting means and the meter base if the service
disconnecting means and meter base are not located within sight and within five
feet of each other.
032 Selective coordination.
(2) The requirements for selective
coordination described in NEC 701.32 are not required where the legally
required standby system was installed prior to June 1, 2006, provided that no
system modifications, additions, deletions, or overcurrent protective devices
in that system were replaced on or after April 1, 2024. For new legally
required standby systems that are supplied from an existing legally required
standby system installed prior to June 1, 2006, the new portion of the legally
required standby system must comply with NEC 701.27. The ground fault sensing
function of overcurrent protective devices will only be required to selectively
coordinate with the ground fault sensing functions of other overcurrent
protective devices.
Notes
Wash. Admin. Code §
296-46B-701
Amended by
WSR
14-11-075, filed 5/20/14, effective 7/1/2014
Amended by
WSR
17-12-021, Filed 5/30/2017, effective
7/1/2017
Amended by
WSR
24-05-085, Filed 2/21/2024, effective
4/1/2024
Statutory Authority:
RCW
19.28.006,
19.28.010,
19.28.031,
19.28.041,
19.28.061,
19.28.101,
19.28.131,
19.28.161,
19.28.171,
19.28.191,
19.28.201,
19.28.211,
19.28.241,
19.28.251,
19.28.281,
19.28.311,
19.28.321,
19.28.400,
19.28.420,
19.28.490,
19.28.551. 08-24-048, §
296-46B-701, filed 11/25/08, effective 12/31/08; 06-24-041, § 296-46B-701,
filed 11/30/06, effective 12/31/06.