Wash. Admin. Code § 296-67-375 - Process safety culture assessment
(1) The employer
must develop, implement and maintain an effective process safety culture
assessment (PSCA) program.
(2) The
employer must perform an effective PSCA and produce a written report within 18
months following the effective date of Part B of this chapter, and at least
every five years thereafter. If the employer has performed and documented a
PSCA up to 18 months prior to the effective date of Part B of this chapter, and
that PSCA includes the elements required in this section, that PSCA may be used
to satisfy the employer's obligation to complete an initial PSCA.
(3) The PSCA must be developed and
implemented by a team that must include at least one member knowledgeable in
refinery operations and at least one employee representative. The team must
consult with at least one employee or other individual(s) with expertise in
assessing process safety culture in the petroleum refining industry.
(4) The PSCA must, at a minimum, include an
evaluation of the effectiveness of the following elements of process safety
leadership:
(a) The employer's hazard
reporting program;
(b) The
employer's response to reports of hazards;
(c) The employer's procedures to ensure that
incentive programs do not discourage reporting of hazards; and
(d) The employer's procedures to ensure that
process safety is prioritized during upset or emergency conditions.
(5) The team must develop a
written report within 90 calendar days of completion of the PSCA, which must
include:
(a) The method(s) used to perform the
PSCA;
(b) The findings and
conclusions of the PSCA; and
(c)
The team's recommendations to address the findings of the PSCA.
(6) The employer, in consultation
with the PSCA team, must prioritize recommendations and implement corrective
actions within 24 months of completion of the written report.
(7) The PSCA team must perform a written
interim assessment of the implementation and effectiveness of each PSCA
corrective action within three years following the completion of a PSCA report.
If a corrective action is found to be ineffective, the employer must implement
changes necessary to ensure effectiveness within, but not to exceed, six
months.
(8) The refinery manager or
designee must serve as signatory to all PSCA reports, corrective action plans
and interim assessments.
(9) PSCA
reports, corrective action plans and interim assessments must be communicated
and made available to all affected employees, their representatives, and
participating contractors within 60 calendar days of completion.
(10) Participating contractors must provide
PSCA reports, corrective action plans, and interim assessments to their
employees and employee representatives within 14 calendar days of
receipt.