Wash. Admin. Code § 352-76-080 - What conditions are placed on the use of funds?
The following conditions apply to the use of the funds:
(1) Project contract. For every funded
project a contract must be executed by the director on behalf of the commission
and by the funding recipient. Generally, the funding recipient will not be
reimbursed for costs incurred prior to the execution of the contract by both
parties.
(2) Technical standards.
The funding recipient for boat sewage disposal facilities shall ensure that
design and installation of the facilities are in accordance with the technical
standards provided by state parks.
(3) Signage.
(a) Boat sewage disposal facilities. A
national symbol provided by state parks shall be installed to be clearly
visible to direct boaters entering the boat sewage disposal facility.
Appropriate information shall be provided indicating fees, restrictions, hours
of operation, operating instructions, and a contact name and telephone number
if the facility is inoperable.
(b)
Educational/information projects. Signage must be appropriate to local
conditions and address local environmental needs. The clean vessel symbol
provided by state parks shall be used in all signage.
(4) Public access. All recreational vessels
must have access to boat sewage disposal facilities funded under this grant
program. Facilities shall be operated, maintained, and continue to be
reasonably accessible to all recreational vessels for the full period of their
useful life.
(5) Operation and
maintenance. All facilities funded under this program shall be operated and
maintained by the funding recipient for the full period of their useful life.
All structures and related assets are to be used for their stated
purpose.
(6) Reporting
requirements. The funding recipient shall submit the reports required by state
parks as directed in the funding contract.
(7) Compliance with state and federal laws,
regulations, and policies. In accepting project funding, the funding recipient
must agree to and certify compliance with all applicable federal and state
laws, regulations and policies.
(8)
Accountability. Funding recipients shall maintain accurate accounting records
on the expenditure of project funds, provide state parks with these records
consistent with the agreement or upon request, and permit state parks to audit
the use of funds in accordance with generally accepted audit practices and
standards. State parks reserves the right to terminate its participation in any
project which fails to perform according to the requirements of this
chapter.
(9) Fees charged. A
maximum five-dollar fee may be charged, with no justification, for use of boat
sewage disposal facilities constructed, operated or maintained with grant
funds. If higher fees are charged, they must be justified and approved by the
director prior to charging a higher fee. Proceeds shall be retained, accounted
for, and used by the operator to defray operation and maintenance costs as long
as the facility is needed and it serves its intended purpose. The maximum fee
shall be evaluated for inflation as determined by the director.
Notes
Statutory Authority: RCW 88.12.235. 98-07-021, § 352-76-080, filed 3/10/98, effective 4/10/98. Statutory Authority: RCW 88.12.325. 94-13-082, § 352-76-080, filed 6/13/94, effective 7/14/94.