Wash. Admin. Code § 468-19-040 - Joint checks
(1) Joint checks
may only be used by a MWBE to pay for materials or supplies.
(a) A joint check is a check between a MWBE
and the prime contractor to the supplier of materials/supplies, only.
(b) The check is issued by the prime
contractor as payer to the MWBE and the material supplier jointly for items to
be incorporated into the project.
(c) The MWBE must release the check to the
supplier, while the prime contractor acts solely as the guarantor.
(2) A joint check agreement must
be approved by the WSDOT and requested by the MWBE involved. The MWBE joint
check agreement between the parties involved must include the conditions of the
arrangement and the expected use of the joint checks.
(3) The prime contractor shall not directly
pay the supplier for materials or supplies used by the MWBE.
(4) If the procedures described herein are
not followed, the MSVWBE may be determined to not be providing a CUF.