W. Va. Code R. § 64-19-5 - Records of Completed Water Wells
5.1. Within thirty (30) calendar days after
the water well has been constructed, altered, or abandoned, the certified well
driller shall submit a completion report to the Commissioner. The date of
construction and time of completion is the date and time the rig is removed or
pulled off the borehole or well. The certified well driller who actually
performed the construction, alteration or abandonment of the well or provided
the on-site supervision of the well construction, alteration or abandonment
shall sign the completion report. A master well driller is required to sign the
completion report when a journeyman well driller conducts the on-site
supervision and drilling.
5.2.
Completion reports shall be filed for pump installation. When the pumping
equipment is installed after the record of completion has been submitted, the
record shall be amended by the certified well driller or pump installer and
resubmitted to the Commissioner within thirty calendar days of installation of
the pumping equipment. The certified well driller or pump installer who
actually performed the installation of the pump system shall sign the amended
record of completion.
5.2.a. A completion
report is not required for the repair of pumps or the replacement of pumps or
pumping equipment if the depth of the setting and efficiency are not
affected.
5.3. The
contractor shall provide two copies of the completion report to the
Commissioner and one copy of the completion report to the owner.