W. Va. Code R. § 64-3-4 - [Effective 7/1/2025] Public Water System Construction, Alteration, or Renovation; Standards; Exceptions
4.1. A
person shall not construct, alter, renovate, or award a contract for any
construction, alteration, or renovation of a public water system without
obtaining a permit from the commissioner.
4.2. Application for a permit to construct,
alter, or renovate shall be made to the commissioner on forms prescribed by the
commissioner at least 45 working days prior to the date on which approval by
the commissioner is desired. The application shall be accompanied by an
engineering report, maps, and detailed plans and specifications of the proposed
construction, alteration, or renovation prepared by or under the direction of a
registered professional engineer.
4.3. The commissioner may revoke a permit to
construct, alter, or renovate for failure of the public water system to comply
with this rule.
4.4. A permit to
construct, alter, or renovate is valid for five years from the date of
issuance.
4.5. The public water
system shall be constructed, altered, or renovated in accordance with the plans
and specifications approved by the commissioner in accordance with the Bureau
for Public Health's rule, "Public Water System Design
Standards," 64CSR77.
4.6. To the
extent practical, all new or expanded facilities shall be located outside the
hundred-year flood plain.
4.7. The
commissioner may issue an order requiring a change in the source of the water
supply for the system or in the manner of collection, treatment, storage, or
distribution before delivery to the consumer as may be necessary to safeguard
the public health.
4.8. A permit to
construct, alter, or renovate is not required for any minor addition to, or
alteration, or renovation of an existing public water system which will not
significantly affect the quality or quantity of the water supply service
rendered. The work shall be done in accordance with the provisions of the
Bureau for Public Health's rule, "Public Water System Design Standards,"
64CSR77.
4.9. A public water system
shall submit a written description of the proposed additions, alterations, or
renovations to the commissioner no less than 10 working days prior to
implementing the additions, alterations, or renovations under this provision.
The commissioner shall notify the system whether the proposed additions,
alterations, or renovations qualify under this provision within five working
days of receipt of the description.
4.10. All public water supply systems using a
raw water source which is open to the atmosphere or subject to surface runoff
shall, at a minimum, provide filtration treatment.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.