W. Va. Code R. § 64-47-4 - [Effective 7/1/2025] Sewage Collection Systems
4.1. General.
4.1.a. Design. The design of new systems or
extensions to existing systems shall carry sanitary sewage flows plus contain
an allowance for non-excessive infiltration.
4.1.b. Modifications. Modifications to the
design on existing systems shall be to carry sanitary sewage flows plus contain
an allowance for non-excessive infiltration and inflow.
4.1.c. Overflows. The Commissioner shall
review on a case-by-case basis, overflows from new interceptor
sewers.
4.1.d. Combined Sewers. The
Commissioner shall not approve new combined systems.
4.1.e. Design Factors. In determining the
required capacities of sanitary sewers, an applicant shall consider the
following factors:
4.1.e.1. Maximum hourly
quantity of sewage;
4.1.e.2.
Additional maximum wastewater flow from industrial plants; and
4.1.e.3. Groundwater infiltration.
4.1.f. Design Basis Per Capita
Flow. To arrive at average dry weather flows from combined residential,
commercial, and institutional sources, an applicant shall design a new system
on the basis of one of the following two methods:
4.1.f.1. Using estimates based on a one-year
record of a fully documented analysis of water use adjusted for consumption and
losses; or
4.1.f.2. Using state
developed per capita wastewater flows using 70 GPCD or existing water usage
records for various sizes and types of municipalities.
4.2. Gravity.
4.2.a. Design Period. The maximum allowable
design period for sewers is 50 years for the estimated tributary area. This
rule shall allow phasing of collection system.
4.2.b. Infiltration Allowance and Industrial
Flows. The Commissioner may add an infiltration allowance to the per capita
design flows of 200 gallons per inch diameter per mile per day and a reasonable
allowance for future industries to arrive at the average daily flow
(ADF).
4.2.c. Peak Flows.
4.2.c.1. When flowing full, an applicant
shall make sewer designs to carry a peak flow of:
4.2.c.1.A. Lateral Sewers - 4 x ADF;
and
4.2.c.1.B. Trunk and
Interceptor and Outfall Sewers - 2.5 x ADF.
4.2.d. When deviating from the above stated
peak design flows, an applicant shall provide in the design engineering report
a brief justification and description of the procedure he or she used for sewer
design.
4.2.e. Calculation. An
applicant shall present computations and other design data for proposed sewage
collection and treatment facilities of greater than 100,000 gallons per day, in
an appropriate form to the Commissioner. The computations shall include:
4.2.e.1. Average daily flow and peak daily
flow at critical points such as the change in size of sewers; and
4.2.e.2. The velocity at minimum, average and
peak flows in sewers, as required.
4.2.f. Minimum Size.
4.2.f.1. No gravity sewer shall be less than
eight inches in diameter except for using six inch diameter sewer pipe for
lateral sewers when:
4.2.f.1.A. No possibility
of future extension exists; and
4.2.f.2.B. The sewer cannot service more than
either 30 mobile homes or 23 residences.
4.2.f.2. There shall be no allowance for a
four-inch sewer pipe for the gravity collection system.
4.2.g. Small Diameter-Gravity Sewers.
4.2.g.1. On a case-by-case basis the
Commissioner may allow these sewers for sanitary sewage collection.
4.2.g.2. Pretreatment is a requirement prior
to discharge into these small diameter-gravity sewers.
4.2.g.3. The minimum pipe size is four
inches.
4.2.g.4. An applicant may
use cleanouts instead of manholes and shall install them:
4.2.g.4.A. At all changes in direction;
and
4.2.g.4.B. At all
connections.
4.2.h. Cover. The minimum allowable earth
cover on sewers is three feet unless otherwise approved by the Commissioner.
Generally, sewers shall be sufficiently deep enough to drain basement fixtures,
to protect the sewers from surface loadings and to prevent freezing.
4.2.i. Slope.
4.2.i.1. For new sewers, the design and
construction shall be to give velocities, when flowing full, of not less than
two feet per second based on Kutter's or Manning's formula using an "n" value
of 0.013.
4.2.i.2. For existing
sewers, the Commissioner recommends a value of "n" as 0.015 to determine
existing capacities. The Commissioner shall grant permission to use other
practical "n" values if he or she considers it justifiable on the basis of
research or field data an applicant presents.
4.2.i.3. The Commissioner recommends slopes
greater than the ones in Table 64-47-C. at the end of this rule that contains
minimum required slopes.
4.2.i.4.
Under special conditions, if detailed data given are justifiable, the
Commissioner may grant an applicant permission to use slopes slightly less than
those required for the two feet per second velocity when flowing full. When
selecting decreased slopes, the engineer shall provide the Commissioner a
report and the computations of the depth of flow in the pipes at minimum,
average, and peak rates of flow. This rule recognizes that the decreased slopes
may cause additional sewer maintenance.
4.2.i.5. Sewers shall lay in a straight line
with uniform slope between manholes. Concrete anchors, or approved equal, shall
anchor sewers laid on a 20% slope or greater and spaced as follows:
4.2.i.5.A. Not over 36 feet center to center
on slopes between 20% to 35%.
4.2.i.5.B. Not over 24 feet center to center
on slopes between 35% to 50%.
4.2.i.5.C. Not over 16 feet center to center
on slopes 50% and over.
4.2.j. Alignment. Sewers 24 inches in
diameter or less shall lay with straight alignment between manholes.
4.2.k. Increasing Size. When a sewer joins a
larger one, the invert of the larger sewer shall be sufficiently lower to
maintain the same energy gradient. An approximate method for securing these
results is to place the 0.8 depth of both sewers at the same elevation.
4.2.l. High Velocity Protection.
An applicant shall make special provisions to protect against displacement by
erosion and shock when velocities are greater than 15 feet per
second.
4.2.m. Materials. The
material selected for the pipe shall be adaptable to local conditions, such as
character of industrial wastes, possibility of septicity, soil characteristics,
exceptionally heavy external loadings, abrasion, and similar problems.
4.2.n. Types of Gravity Pipe.
Design of all sewers shall be to prevent damage from superimposed loads. Proper
allowance for loads on the sewer shall be according to the width and depth of
trench. Construction of gravity sewer lines shall be of clay, plastic, ductile
iron, or concrete sewer pipe meeting the following minimum specifications:
4.2.n.1. House Connection to Collector
Sewers:
Clay - ASTM C 700
Plastic - ASTM D 2729, D 2751, D 2836, D 2852
Ductile Iron - AWWA C-110, C-151, Cement lined
Concrete - ASTM C 14
4.2.n.2. Collector and Interceptor Sewers:
Clay - ASTM C 700 - Joints meet the requirements of ASTM C 425. This rule does not permit seal joints or cement joints.
Plastic - ASTM D 3033, D 3034, F 789, A 2000
Composite - ASTM D 2680
Ductile Iron - AWWA C-110, C-151, Cement lined
Concrete - ASTM C-76
4.2.o. Bedding. In accordance with ASCE
Manual & Report on Engineering Practice No. 37, bedding shall be Class "A",
"B", "C." To provide the strength necessary for future soil and load
conditions, the engineer shall determine the class of bedding.
4.2.p. Inverted Siphons. Inverted siphons
shall have not less than two barrels, with a minimum pipe size of six inches,
and be provided with necessary appurtenances for convenient flushing and
maintenance. The manholes shall have adequate clearances for rodding; and in
general, provide sufficient head and pipe sizes selected to secure velocities
of at least three feet per second for average flows. Arrangement of the inlet
and outlet details shall be to divert the normal flow to one barrel in order to
take either barrel out of service for cleaning. Use of ductile iron pipe or
equal is a requirement.
4.2.q.
Stream Crossing. When sewers must cross under a stream or watercourse, there
shall be a minimum separation of three feet between the stream bed and the top
of the sewer pipe. However, the Commissioner may approve other methods provided
there is equivalent protection and performance. Use of ductile iron pipe or
equal is a requirement.
4.2.r.
Aerial Sewers. Aerial sewers require the Commissioner's prior
approval.
4.2.s. Protection of
Drinking Water Supplies.
4.2.s.1. Water
Supply Interconnections. There shall be no physical connection between a public
or private drinking water supply system and a sewer or appurtenance.
4.2.s.2. Relation to Public Water Systems. A
general guideline is that gravity or pressure sanitary sewers, or both, shall
be at least 10 feet horizontally from a drinking water supply.
4.2.s.3. Relation to Wells. No gravity or
pressure sanitary sewer line shall be located within 50 feet of a public,
private, or individual homeowner's drinking water well. However, if physical
limitations prevent a 50-foot separation, the Commissioner may give written
approval for variance from these requirements. Under no conditions shall the
construction of any gravity or pressure sanitary sewer be closer than 10 feet
to a private homeowner's well.
4.2.s.4. Relation to Water Lines.
4.2.s.4.A. Horizontal Separation. Gravity or
pressure sanitary sewers shall be at a minimum of 10 feet horizontally away
from any existing or proposed water lines. However, if maintaining the 10-foot
horizontal separation is not possible, the construction of the sewer and
testing shall be as prescribed in paragraph 4.2.s.5. of this rule. A sewer
shall not be constructed closer than three feet edge to edge to a water
line.
4.2.s.4.B. Vertical
Separation. When a gravity or pressure sanitary sewer must cross water lines,
its construction shall be at an elevation so that the top of the sewer line is
a minimum of 18 inches beneath the bottom of the water main. However, if
meeting the 18-inch vertical separation requirement is not possible, then the
construction of the sewer and testing shall be as prescribed in paragraph
4.2.s.5. of this rule.
4.2.s.5. Special Construction Requirements.
4.2.s.5.A. Horizontal. In cases where water
and gravity or pressure sanitary sewer lines must lay closer than 10 feet
apart, the sewer line construction shall be a minimum of 18 inches lower than
the water line and constructed of a pressure type pipe meeting requirements for
water lines. The installation shall undergo hydraulic testing for a period of
not less than 24 hours and considered satisfactory if leakage is not more than
0.25 gallons per inch diameter of pipe per joint. In lieu of hydraulic testing,
the sewer line can be air tested. The placement of the water line shall be upon
an undisturbed earth shelf or bench. Backfilling to create the bench is not
permissible. Maintaining maximum possible horizontal distance between the lines
is a requirement. Where meeting these conditions is not possible, an applicant
shall obtain written approval for a variance from the Commissioner. When
placement of the lines is within five feet of each other, each line shall have
a metallic impregnated, permanent identification tape buried directly above it
denoting "sewer line" or "potable water line."
4.2.s.5.B. Vertical. If maintaining a
vertical clearance of 18 inches as specified in subparagraph 4.2.s.4.B. of this
rule is not possible, the location of the gravity or pressure sanitary sewer
shall be so that it crosses between joints of the water line. Also,
construction of the sewer line shall be so that it crosses under the water line
at mid joint. The construction of the sewer shall be of a pressure type pipe
meeting the requirements for water lines at the crossing. This rule requires
maintaining a minimum vertical clearance of six inches between the sewer and
water lines. The construction of a gravity or pressure sanitary sewer line, or
both, shall not be over the top of a water line. However, when meeting the
standard vertical installation requirements is not possible, encase the sewer
line so that the casing extends at least 10 feet on each side of the crossing.
This rule requires maintaining a minimum vertical separation of 18 inches
between the lines.
4.2.t. Sewer Riser Pipes.
4.2.t.1. All mobile home lots shall have a
sewer riser pipe with a minimum diameter of four inches and extend at least
four inches above the ground in a vertical position.
4.2.t.2. When not serving a mobile home, all
sewer riser pipes shall be tightly capped or plugged to keep them
watertight.
4.3. Manholes.
4.3.a. Location. Manholes shall be placed:
4.3.a.1. At the end of each sewer
line;
4.3.a.2. At all changes in
slope, size, or alignment;
4.3.a.3.
At all intersections; and
4.3.a.4.
At distances not greater than 400 feet for sewers 15 inches in diameter or
less, and 500 feet for sewers 18 inches to 30 inches in diameter. The
Commissioner may waive this requirement and permit greater spacing in larger
sewers and in sewers carrying settled effluent.
4.3.a.5. This rule allows for the
construction of cleanouts at the upper end of all lines. In some special
conditions, cleanouts may replace manholes, but installation of them requires
approval by the Commissioner prior to installation.
4.3.b. Materials. Manholes shall be pre-cast
concrete, poured-in-place concrete, or concrete manhole block.
4.3.c. Drop Type. A sewer entering a manhole
at an elevation of 24 inches or more above the manhole invert provides for
outside drop pipe. The entire drop connection shall be encased in concrete. If
an inside drop is necessary, the manhole and access provided for cleaning shall
have a pipe fastened to it.
4.3.d.
Diameter. The minimum base diameter of manholes shall be 48 inches. Larger
diameters are preferable for large diameter sewers with a minimum opening of 24
inches.
4.3.e. Steps. There shall
be a provision for non-corrosive steps embedded in the walls, offset and spaced
12 to 18 inches apart vertically.
4.3.f. Flow Channel. The inside base of the
manhole shall be filled with concrete to form a bench sloping toward the flow
channel. In addition, both the flow channel and the bench shall be troweled to
a smooth surface.
4.3.g.
Watertightness. Solid manhole covers are required where the manhole covers may
flood by street runoff or high water.
4.3.g.1. Manholes of segmented block shall
have waterproofing on the exterior with plaster coatings, supplemented by a
bituminous waterproof coating;
4.3.g.2. Concrete manholes shall have
waterproofing on the exterior where groundwater conditions are unfavorable;
and
4.3.g.3. Pipe connections to
manholes and joints on manholes shall be watertight.
4.4. Pumping Station.
4.4.a. General.
4.4.a.1. Flooding. The location of stations
including electrical equipment shall be at an elevation not subject to the
100-year flood or otherwise have adequate protection against the 100-year
flood.
4.4.a.2. Location.
4.4.a.2.A. Preferably, the location shall be
off the right-of-way of streets and alleys and shall be a suitable
structure;
4.4.a.2.B. The station
shall be readily accessible, but be as far as possible from the nearest
dwelling; and
4.4.a.2.C. Fencing
shall be required to prevent entry of unauthorized persons unless the
Commissioner gives prior approval for an alternative method.
4.4.a.3. Overflows. There shall be
no overflows or bypasses from lift stations at new facilities.
4.4.a.4. Pumping Rates and Number of Pumping
Units. All lift stations, each capable of providing the maximum design flow,
shall have minimum dual pumps. The size of the pumping units shall be to
provide the minimum cleaning velocity of two feet per second at the rated
capacity, assuming a C=120 for plastic pipe and C=100 for all other pipe
materials in the Hazed-Williams Formula.
4.4.a.5. Type. The Commissioner may approve
the wet well or wet well/dry well type, or both.
4.4.b. Design.
4.4.b.1. Long Drive Shaft Pumps. A wet well
installation achieved by mounting the pump in the wet well and connecting it by
a drive shaft to the motor above the wet well shall not be approved.
4.4.b.2. Separation. There shall be complete
separation of the wet well and dry well, including its
superstructure.
4.4.b.3. Pump
Removal. There shall be provisions to facilitate removing pumps and
motors.
4.4.b.4. Access. Dry wells
of pumping stations and wet wells containing either bar screens or mechanical
equipment requiring inspection or maintenance shall have suitable and safe
means of access.
4.4.b.5. Size. The
effective capacity of the wet well shall provide a detention time not exceeding
30 minutes for the design average flow.
4.4.b.6. Floor Slope. The wet well floor
shall have a minimum slope of one to one towards the hopper bottom. The
horizontal area of the hopper bottom shall be no greater than necessary for
proper installation and function of the inlet. Bottoms shall have a smooth
finish.
4.4.b.7. Protection Against
Clogging.
4.4.b.7.A. Readily accessible bar
screens with clear openings not exceeding 2.5 inches, unless using pneumatic
ejectors or installing special devices to protect the pumps from clogging or
damage, may precede pumps handling raw sewage;
4.4.b.7.B. Where the size of the installation
warrants, this rule recommends a mechanically cleaned bar screen with a grinder
or comminution device;
4.4.b.7.C.
There shall be convenient facilities for handling screenings where screens are
located; and
4.4.b.7.D. It is
preferable to use duplicate protection units of proper capacity for the larger
or deeper sections.
4.4.b.8. Pump Openings.
4.4.b.8.A. Pumps shall be capable of passing
2.5-inch solids or be of the grinder pump type when used in residential
developments of 500 persons or less;
4.4.b.8.B. Pumps for all other installations
shall be capable of passing three-inch solids or be of the grinder pump type;
and
4.4.b.8.C. Pumps shall be
non-clog type pumps or ejectors.
4.4.b.9. Priming. The placing of the pump
shall be so that under normal operating conditions it shall operate under a
positive suction head, except as specified for suction lift pumps.
4.4.b.10. Electrical Equipment. Electrical
systems and components such as motors, lights, cables, conduits, switch boxes,
and control circuits, in enclosed or partially enclosed spaces, shall be of
materials resistant to the environment when usage takes place.
4.4.b.11. Intake. Each pump shall have an
individual intake. Wet well design shall be such as to avoid turbulence near
the intake.
4.4.b.12. Dry Well
Dewatering.
4.4.b.12.A. The dry wells shall
have a separate pump in them to remove leakage or drainage with the discharge
above the overflow level of the wet well;
4.4.b.12.B. A connection to pump suction may
be used as an auxiliary feature;
4.4.b.12.C. Water ejectors connected to a
drinking water supply shall not be approved; and
4.4.b.12.D. All floor and walkway surfaces
shall have an adequate slope to a point of drainage.
4.4.b.13. Controls.
4.4.b.13.A. Control float cables' location
shall not be affected by the flows entering the wet well or by the suction of
pumps;
4.4.b.13.B. Float tubes in
dry wells shall extend high enough to prevent overflow;
4.4.b.13.C. A means to automatically
alternate the pump in use shall be in place; and
4.4.b.13.D. Pump stations with motors or
controls below grade shall have a secure external disconnect switch.
4.4.b.14. Valves and Piping.
4.4.b.14.A. Pumps shall have a full closing
valve on the suction piping except on submersible and vacuum primed
pumps;
4.4.b.14.B. The installation
of a check valve followed by a gate valve on the discharge piping is required;
and
4.4.b.14.C. The location of the
valves shall not be in a wet well.
4.4.b.15. Ventilation. All dry well
installations shall have mechanical ventilation.
4.4.b.15.A. Wet Wells. Ventilation shall be
either continuous or intermittent.
4.4.b.15.A.1. If continuous, ventilation
shall provide at least 12 complete air changes per hour; and
4.4.b.15.A.2. If intermittent, ventilation
shall provide at least 30 complete air changes per hour.
4.4.b.15.B. Dry Wells. Ventilation shall be
either continuous or intermittent.
4.4.b.15.B.1. If continuous, ventilation
shall provide at least six complete air changes per hour; and
4.4.b.15.B.2. If intermit-tent, ventilation
shall provide at least 30 complete air changes per hour.
4.4.b.16. Flow Measurement. There
shall be the capability for placing suitable devices for measuring sewage flow
at all pumping stations, and the devices shall be placed at critically located
pumping stations.
4.4.b.17. Water
Supply. There shall be no physical connection between any potable water supply
and a sewage pumping station.
4.4.b.18. Alarm Systems. All pump station
installations shall equip a high-water alarm light at the lift
station.
4.4.b.19. Reliability. At
the determination of the Commissioner, emergency power may be a requirement
under specific circumstances, such as above water intakes, recreational waters,
or other situations.
4.4.b.20.
Portable Equipment. In some instances, portable equipment may furnish service
to more than one pumping station. However, when using this equipment, it shall
have the capability to operate between the wet well and the discharge side of
the station. The station shall equip permanent fixtures that shall facilitate
rapid and easy connection of lines.
4.4.b.21. Emergency Power Generation. All
emergency power generation equipment, if required, shall include instructions
indicating the essential need of routinely and regularly starting and running
the units at full load.
4.4.c. Suction Lift Pumps.
4.4.c.1. Suction lift pumps shall be of the
self-priming or vacuum priming type.
4.4.c.1.A. Self-priming Pumps. Self-priming
pumps shall be capable of rapid priming and repriming at the "lead pump on"
elevation. Accomplishing the self-priming and repriming shall be automatic
under design operating conditions. Suction piping shall not exceed the size of
the pump suction and shall not exceed 25 feet in total length. Priming lift at
the "lead pump on" elevation shall include a safety factor of at least four
feet from the maximum allowable priming lift for the specific equipment at
design operating conditions. The combined total of dynamic suction lift at the
"pump off" elevation and required net positive suction head at design operating
conditions shall not exceed 22 feet.
4.4.c.1.B. Vacuum-priming Pump Stations.
Vacuum-priming pump stations shall equip dual vacuum pumps capable of
automatically and completely removing air from the suction lift pump. The
vacuum pumps shall have adequate protection from damage due to sewage. The
combined total of dynamic suction lift at the "pump off" elevation and required
net positive suction head at design operating conditions shall not exceed 22
feet.
4.4.c.2. The net
positive suction head and specific speed requirements as stated on the
manufacturer's pump curve under the most severe operating conditions shall
limit the capacity of a suction lift pump.
4.4.c.3. The location of the suction lift
pumps shall not be within the wet well.
4.4.c.4. Access to the wet well shall not be
through the dry well, and the dry well shall have a gas-tight seal when mounted
directly above the wet well.
4.4.d. Submersible Pumps.
4.4.d.1. Pump Removal. Pumps shall be readily
removable and replaceable without dewatering the wet well or disconnecting any
piping in the wet well.
4.4.d.2.
Hoist Provision. The Commissioner may require a submersible pumping facility to
have a hoist for removing the pump from the wet well.
4.4.d.3. Electrical Control Location. The
location of electrical controls shall be outside the wet well in a suitable
housing for protection against weather and vandalism.
4.4.e. Pneumatic Ejectors.
4.4.e.1. Venting. This rule requires the
venting of ejector pots to the atmosphere.
4.4.e.2. Duplicate Compressors. There shall
be duplicate compressors and consideration shall be given to providing an air
storage tank.
4.4.f.
Force Mains.
4.4.f.1. Size. Minimum size of
force mains to serve facilities having a population of 500 people or less shall
be three inches for solids passing pumps. Minimum size of force mains serving
populations of over 500 people, shall be four inches for solids passing pumps.
Applicant may utilize smaller size force mains in conjunction with grinder
pumps.
4.4.f.2. Air Relief Valve.
Placement of air relief valves shall be at high points in the force
mains.
4.4.f.3. Termination. The
force mains shall enter the receiving manhole with its center-line horizontal
and with an invert elevation that shall insure a smooth laminar flow transition
to the gravity flow section, but in no case shall the force main enter the
gravity sewer system at a point more than one foot above the flow line of the
receiving manhole.
4.4.f.4.
Materials of Construction. The construction of force mains shall be of plastic,
ductile iron or cement lined steel pipe bearing the pressure class required by
the total dynamic head.
4.4.f.5.
Anchoring. Anchoring of the force mains shall be sufficient within the pump
station and throughout the line length. The number of bends shall be as few as
possible. There shall be thrust blocks, restrained joints, or tie rods where
there is a need for restraint.
4.5. Vacuum Sewage Collection Systems.
4.5.a. Main Lines.
4.5.a.1. Materials.
4.5.a.1.A. PVC or ABS of schedule 40 DWV,
Class 200, or SDR 21.
4.5.a.1.B.
Joints may be either solvent welded, O-ring, or heat fusion joints, that have a
specific design to seal against vacuum.
4.5.a.2. Piping.
4.5.a.2.a. Minimum diameter pipe size shall
be three inches in the collection system.
4.5.a.2.B. There shall be clean outs at a
maximum of every 200 feet on straight runs and at changes in
direction.
4.5.a.2.C. Frost depth
or load condition shall dictate how deep to bury the line, but except as
allowed on a case-by-case basis by the Commissioner, it shall be no less than
three feet deep.
4.5.a.2.D. The
system manufacturer shall certify all vacuum system designs.
4.5.a.2.E. The applicant shall utilize the
manufacturer's recommendation for reform pockets and lifts.
4.5.a.2.F. Total available head loss from any
input point should not exceed 18 feet of water. There shall be a reserve of
five feet of water for valve operation.
4.5.a.2.G. Installation of the collection
system shall meet the following tightness test specification, "the system shall
be vacuumed to 24 inches of mercury vacuum pressure, allowed 15 minutes to
stabilize, and thereafter shall not lose more than 1% vacuum pressure per hour
over a minimum of a four-hour period." There shall be testing prior to the
installation of valves.
4.5.b. House Connections.
4.5.b.1. Pneumatic or electric controllers
shall actuate valves. This rule prohibits valve systems that are electrically
controlled. Minimum valve size shall be three inches.
4.5.b.2. The location of the valve shall be
outside the dwelling. The location of the pipe between the dwelling and valve
shall be to provide 10 to 15 gallons storage, or the location of a 30-gallon
tank shall be between the dwelling and the valve. This rule requires a
permanent maintenance easement for the valve and its appurtenances.
4.5.b.3. Valve boxes shall have a solid
bottom and be counter weighted to prevent flotation when located in an area
subject to flooding or high ground water. The cover and valve box material
shall be of adequate strength to withstand the expected maximum dynamic and
static loading conditions. Venting valve boxes shall reduce condensation and
shall be constructed of corrosion resistant material.
4.5.b.4. The vent system for the house shall
have a diameter of three inches or greater to prevent evacuation of traps
during vacuum valve operation. The vent pipe shall extend above the eaves of
the house. The commissioner shall consider other methods for venting on a
case-by-case basis.
4.5.b.5. Those
systems using a pneumatic controller shall have adequate protection of the
sensor controllers, and any portion of the controller apparatus vented to
atmosphere shall have protection from flooding, screened from insect entry, and
provided with rain covers.
4.5.c. Sewage Collection Tanks.
4.5.c.1. The sewage collection tanks shall be
of either coated welded steel or fiber glass and shall be vacuum
tight.
4.5.c.2. Each inlet to the
tank shall have its own shut-off valve.
4.5.c.3. There shall be liquid level sensors
installed to operate the discharge sewage pumps, the high-level alarm and to
interrupt the electrical power to the vacuum pumps.
4.5.c.4. The size of the collection tank
shall be to hold a maximum of 10 minutes design flow. The size of the
collection tanks shall be at 1.5 x operating volume or a minimum of 400
gallons.
4.5.d. Vacuum
Pumps.
4.5.d.1. There shall be vacuum reserve
tanks installed in series between the sewage collection tank and the vacuum
pumps.
4.5.d.2. This rule allows
for the use of either liquid ring or sliding vane vacuum pumps as long as they
are compatible with pumping moist air containing some sewer gases.
4.5.d.3. There shall be a check valve
installed between the vacuum reservoir tank and the vacuum pumps.
4.5.d.4. There shall be dual vacuum pumps,
each capable of handling the load, and emergency back-up power.
4.5.d.5. Venting the vacuum pump exhaust
outside the building is a requirement. If there is a possibility of objectional
odors due to proximity of inhabited dwellings, the evacuation line from the
vacuum reserve shall have carbon absorption.
4.5.e. Sewage Pumps.
4.5.e.1. There shall be dual pumps, each
capable of handling 2.5 times the average daily flow.
4.5.e.2. There shall be emergency back-up
power to operate the entire system.
4.5.e.3. The sewage pumps shall be capable of
meeting the NPSH requirements as dictated by the vacuum conditions in the
sewage collection tanks.
4.5.e.4.
There shall be shut-off valves so that each pump can be isolated for
repairs.
4.5.e.5. The discharge
piping shall incorporate a check valve/gate valve arrangement such as utilized
in a conventional pump station.
4.5.e.6. High level alarms and loss of vacuum
alarms shall be capable of transmitting to three or more responsible
parties.
4.5.f. Design
Requirements.
4.5.f.1. It is a requirement to
submit hydraulic calculations for the vacuum mains and force mains with the
application.
4.5.f.2. It is a
requirement to submit plans and profiles of all mains. Profiles shall indicate
depth to mains, and plans shall indicate all valves.
4.5.f.3. When these standards are not
applicable, it is a requirement to follow the manufacturer's
recommendations.
4.5.g.
Maintenance and Operation.
4.5.g.1. Factory
trained maintenance personnel employed by the entity shall be available 24
hours per day.
4.5.g.2. An
applicant shall keep an inventory of parts including spare valves, controllers,
valve pits, and others.
4.5.g.3.
This rule does not allow mixing of equipment such as different makes and
models, for a specific project.
4.5.h. Miscellaneous.
4.5.h.1. Collection stations shall equip
ventilators and heater dehumidifiers.
4.5.h.2. Branch lines shall have individual
cut off valves to allow isolation of the line for repair. Main line sections
shall have isolation valves no less than 2,000 feet apart.
4.5.h.3. Consideration to lessen the size of
the treatment units in new systems that utilize water saving devices such as
vacuum toilets, shall be based upon review and approval by the
Commissioner.
4.5.h.4. Retaining
spare controllers, valves, and sensors shall be on a basis of one per each 15
units installed.
4.5.h.5. House
vent stacks shall be at least three inches in diameter. If necessary, there
shall be an installation of a three- to four-inch stack on the gravity sewer
lateral adjacent to the house wall.
4.5.i. Relation of vacuum lines to water
lines shall be as for gravity lines. See paragraph 4.2.s.4. of this rule.
4.6. Pressure Sewage
Collection System.
4.6.a. General.
4.6.a.1. Simplex units shall serve no more
than three residences. Duplex units shall serve no more than 10 residences.
Other multiple source applications require approval by the Commissioner. This
rule requires spare pumps.
4.6.a.2.
Types of Pressure Systems.
4.6.a.2.A. Grinder
Pump Pressure System.
4.6.a.2.B.
Septic Tank Effluent Pumping Pressure System.
4.6.a.3. Types of Pumps.
4.6.a.3.A. Submersible, Centrifugal Grinder
Pumps. Pumps shall be readily removable and replaceable without dewatering the
wet well.
4.6.a.3.B. Semi-Positive
Displacement Grinder Pumps. Pumps shall be readily removable and replaceable
without dewatering the wet well. There shall be pressure relief valves unless
the Commissioner approves another means of pressure relief.
4.6.a.3.C. Non-Clog Submersible Centrifugal
Effluent Pumps.
4.6.b. Design Requirements.
4.6.b.1. Hydraulic Calculations. Submitting
calculations with the application is a requirement.
4.6.b.1.A. The determination of peak flows
shall be from the manufacturers recommendations based upon the pumping
equipment the system is using.
4.6.b.1.B. There shall be head losses due to
valves and fittings.
4.6.b.1.C. For
purposes of calculation, using a C=100 in the Hazen-Williams Formula for all
pipe, except for using a C=120 for plastic pipe is a requirement.
4.6.b.1.D. Design velocity shall be in the
range of two to five feet per second.
4.6.b.1.E. Computed design life of the pumps
shall be on the basis of 10 years.
4.6.b.2. Plans. Submitting plans and profiles
of all pressure mains is a requirement. Profiles shall indicate depth of
pressure mains. The plans shall indicate all valves.
4.6.b.3. Design. The design shall be in
accordance with the standards herewith stated, except when not covered by this
standard, then following the manufacturer's recommendations is a
requirement.
4.6.c.
Pressure Mains.
4.6.c.1. Type. Minimum
Pressure Rating - PVC SDR 21, Schedule 40, or PVC SDR 26 may be used.
4.6.c.2. Size. The minimum size service line
from the grinder pump to the collection main shall be one and 1.25
inches.
4.6.c.3. Valves and
Cleanouts.
4.6.c.3.A. Valving mains shall
occur at junctions in order that segments of the system may be taken out of
service for maintenance.
4.6.c.3.B.
Cleanouts shall be at junctions so that lines may be cleaned.
4.6.c.3.C. The placement of cleanouts with
valves shall be at every 400 to 600 feet on straight runs.
4.6.c.3.D. The location of cleanouts and
valves shall be at changes in direction of the lines.
4.6.c.3.E. There shall be air release valves
at high points in the line.
4.6.c.3.F. There shall be ball or gate valves
with cleanouts at the ends of lines.
4.6.c.3.G. There shall be a method of
providing continuity of service for main collector lines.
4.6.c.4. Thrust Blocks. There shall be
concrete thrust blocks at changes in direction and at "T" junctions.
4.6.c.5. Flushing. This rule requires using
one of the following methods:
4.6.c.5.A.
Flush tanks of 1,000 gallons capacity with pumps at the ends of
lines;
4.6.c.5.B. Water hydrants
with backflow preventers at the end of lines, the backflow preventer shall be
of the reduced pressure type and shall be non-removable; or
4.6.c.5.C. Water tank truck with
pumps.
4.6.c.6. Relation
to water lines shall be as for gravity lines. See paragraph 4.2.s.4. of this
rule.
4.6.d. Grinder Pump
Pressure System.
4.6.d.1. Location.
4.6.d.1.A. The location of the pump station
shall be outside the residence or commercial building.
4.6.d.1.B. The location of the control box
for a single residence unit shall be on the outside of the building, preferably
with the pump station.
4.6.d.1.C.
For duplex grinder pump stations, the location of the control box shall be with
the pump station.
4.6.d.2. Electrical.
4.6.d.2.A. Control panels shall be of the
NEMA type 3 or 4 enclosure.
4.6.d.2.B. The pump and float electrical
controls shall have provisions for disconnection without entering the main
control box.
4.6.d.3.
Alarms.
4.6.d.3.A. When using a single unit
grinder pump station, there shall be a high-water alarm light outside the
residence.
4.6.d.3.B. When using a
dual grinder pump station, there shall be an alarm light at the control box by
the pump station.
4.6.d.4. Emergency Holding.
4.6.d.4.A. An existing septic tank may act an
emergency holding tank.
4.6.d.4.B.
In areas of frequent power outages of a duration of more than four hours each,
the installation of emergency holding tanks of 200 gallons capacity is a
requirement.
4.6.d.5.
Sequence of Connections. The sequence of valves, pump, and other appurtenances
from the residence to the collection force main shall be as follows: four-inch
sewer line, gate valve, pump, check valve, gate valve, and connection line with
45-degree bend in the direction of flow.
4.6.d.6. Check and Gate Valves.
4.6.d.6.A. Check or gate valves shall be
either plastic or bronze.
4.6.d.6.B. Check valves may be either swing
check or ball type. If using swing type check valves, construction of a one- to
two-foot horizontal run of straight pipe on the downstream side of the check
valve is a requirement.
4.6.d.7. Level Controls. Level controls in
the pump station shall be either mercury magnetic switches, mercury switches,
or pressure switches.
4.6.e. Septic Tank Effluent Pressure Systems.
4.6.e.1. Location. Same as Submersible Pumps.
See subdivision 4.4.d. of this rule.
4.6.e.2. Controls.
4.6.e.2.A. Control panels shall be NEMA type
3 or 4 enclosure.
4.6.e.2.B. The
pump and float controls shall have provision for disconnection without entering
the main control box.
4.6.e.3. Alarms. Same as Grinder Pump
Pressure Systems. See paragraph 4.6.d.3. of this rule.
4.6.e.4. Sequence of Connections. The
sequence of valves, pump, and other appurtenances from the residence to the
collection force main shall be as follows: four-inch sewer line, septic tank,
pumping chamber with pump, check valve, gate valve and connection to main
collection line with 45- degree bend in direction of flow.
4.6.e.5. Check and Gate Valves. Same as
paragraph 4.6.d.6. of this rule.
4.6.e.6. Level Controls. Same as paragraph
4.6.d.7. of this rule.
4.6.e.7.
There shall be provisions for the treatment of septage at the plant. There
shall be a provision for a septic tank pumping vehicle.
4.6.f. Maintenance and Operation.
4.6.f.1. In the interest of obtaining proper
maintenance and operation on a pressure sewer system, the applicant shall be
either:
4.6.f.1.A. Under the jurisdiction of
a public entity;
4.6.f.1.B. Under
the jurisdiction of a private company regulated by the public service
commission; or
4.6.f.1.C. Under the
jurisdiction of a property owners association.
4.6.f.2. Maintenance personnel employed by an
entity operating a pressure system shall attend a factory training course on
maintenance and operation of the proposed units.
4.6.f.3. For maintenance needs, this rule
recommends a truck provided with a hoist.
4.6.f.4. This rule requires permanent
maintenance easements if the location of the pumping equipment and other
appurtenances is on private property.
4.6.f.5. An applicant shall keep spare parts,
such as air relief valves, gate valves, and relay switches in inventory.
4.6.f.6. This rule does not allow
mixing equipment (makes, models) for a specific project.
4.6.f.7. An applicant shall provide spare
pumps in the initial design according to Table 64-47-D. at the end of this
rule.