006-5 Wyo. Code R. §§ 5-4 - Uniform Standards for Assessing and Approving Agency Building and Other Space Needs
(a) Uniform
standards for building and space needs are for planning purposes only; and are
not intended to be regulatory/mandatory, i.e., agency compliance is not
required:
(i) Space planning shall provide a
maximum of approximately 100 square feet for clerical staff; a maximum of 125
square feet for support staff; a maximum of 150 square feet for management
staff; and a maximum of approximately 200 square feet for directors.
(ii) Space shall meet Americans with
Disabilities Act (ADA) requirements.
(iii) Space shall be asbestos free or
abated.
(iv) Electrical service and
conduit adequate for all necessary agency equipment, including communications
room(s) and cable adequate to support both voice and data equipment
requirements.
(v) Adequate
parking.
(vi) Adequate heating
ventilation, air conditioning and insulation.
(vi) Adequate exterior grounds maintenance
systems.
(b) GSD shall
assess agency building requirements/requests and other space needs, according
to the following needs assessment procedures:
(i) GSD shall annually collect uniform data
describing the condition of state buildings.
(ii) All agencies shall provide data
describing the condition of state buildings, using the GSD generated "Initial
Building Survey". Data shall be transmitted via computer whenever
possible.
(iii) Agencies shall send
Capital Outlay Construction requests, "Initial Building Survey(s) and capital
outlay budget narrative(s) to GSD.
(iv) GSD shall cross-reference agency
requests with survey data and verify reliability.
(c) GSD shall forecast building longevity and
future agency space requirements based on information obtained from the needs
assessment.
(d) Needs assessments
shall be utilized in the prioritization of capital construction
requests.
(e) Needs assessments
shall be used to evaluate renovation needs for each state building. Information
obtained from the "Building Survey" shall be used to determine if a
cost/benefit analysis shall be conducted.
(f) Needs assessments shall specify
construction and renovation requirements for a 5 year period. A prioritization
of all statewide requests shall be developed by GSD each year. GSD shall
generate a current fiscal year list of construction/renovation projects and a
list of projects for the 4 succeeding years.
(g) On or before November 1st of each year
and based upon the needs assessment, the SBC shall establish and prioritize
construction, renovation and leasing needs. They shall identify and prioritize
potential projects to be studied for inclusion in the Wyoming public buildings
construction program. Construction and renovation needs shall be prioritized
for the current fiscal year and each of the following 4 fiscal years.
(h) On or before December 1st of each year,
the SBC shall provide this information to members of the legislature.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.