027-9 Wyo. Code R. §§ 9-11 - Changes to Budgeted Funding
(a) In accordance with
W.S.
21-15-119(c) and
W.S.
28-11-301(c)(iv), budgets
for prioritized projects may be adjusted by the Commission and transfers
between project phases may be made by the Department.
(b) In the event that any particular project
budget is or appears to be insufficient to fully fund that project remedy, the
following non-exclusive and non-prioritized list of factors shall be considered
by the Department in recommending whether, and how, that project will be
allowed to proceed with legislative funding:
(i) Verify value engineering recommendations
have been followed;
(ii) Verify
aspects of the design of the project to identify cost savings which may be
generated within the project. In this regard, all parties shall reexamine
earlier assumptions in the search for viable, cost-effective and efficient
design changes;
(iii) Verify the
scheduling, or phasing, of the project to determine if budgeted funds will be
required and cost-savings or cost-deferrals may be obtained by that scheduling.
Decision-making shall take into account the funding cycles of the Legislature
and the uncertainty of future funding.
(c) If these non-prioritized factors are
insufficient to achieve project costs within the project budget, including
adjustment for inflation, the Commission shall consider the following
additional factors:
(i) Change of delivery
method;
(ii) Other sources of
funding, including funding held by the Commission;
(iii) Delayed start date of the project;
and
(iv) Complete or partial
re-planning or re-design of the project.