(a) Limitation.—
Except as provided in subsection (b), the Secretary of Defense may not make a bulk purchase of a drop-in fuel for operational purposes unless the fully burdened cost of that drop-in fuel is cost-competitive with the fully burdened cost of a traditional fuel available for the same purpose.
(b) Waiver.—
(1)
Subject to the requirements of paragraph (2), the Secretary of Defense may waive the limitation under subsection (a) with respect to a purchase.
(c) Definitions.—In this section:
(1)
The term “drop-in fuel” means a neat or blended liquid hydrocarbon fuel designed as a direct replacement for a traditional fuel with comparable performance characteristics and compatible with existing infrastructure and equipment.
(3) The term “operational purposes”—
(4)
The term “fully burdened cost” means the commodity price of the fuel plus the total cost of all personnel and assets required to move and, when necessary, protect the fuel from the point at which the fuel is received from the commercial supplier to the point of use.