(c) Project
(1) In generalSubject to the availability of appropriations under subsection (d), in carrying out the program, the Administrator of the Environmental Protection Agency shall establish a project that is—
(A) carried out in multiple States—
(i)
in each of which is produced cane sugar that is eligible for loans under section 7272 of title 7, or a similar subsequent authority; and
(ii)
at the option of each such State, that have an incentive program that requires the use of ethanol in the State; and
(2) RequirementsA project described in paragraph (1) shall—
(A)
be limited to sugar producers and the production of ethanol in the States of Florida, Louisiana, Texas, and Hawaii, divided equally among the States, to demonstrate that the process may be applicable to cane sugar, sugarcane, and sugarcane byproducts;