(a) Authorization
The Secretary, in cooperation with the Lakehaven Utility District, Washington, is authorized to participate in the design, planning, and construction of, and land acquisition for, a project to reclaim and reuse wastewater, including degraded groundwaters, within and outside of the service area of the Lakehaven Utility District.
(b) Cost share
The Federal share of the cost of the project authorized by this section shall not exceed 25 percent of the total cost of the project.