- § 2631. Accelerated schedule for isolating high-level nuclear waste at the Defense Waste Processing Facility, Savannah River Site
- § 2632. Multi-year plan for clean-up
- § 2633. Continuation of processing, treatment, and disposal of legacy nuclear materials
- §§ 2634 to 2637. Repealed. Pub. L. 113–66, div. C, title XXXI, § 3146(e)(15), Dec. 26, 2013, 127 Stat. 1078
- § 2638. Repealed. Pub. L. 117–263, div. C, title XXXI, § 3132(a)(1)(B)(iii), Dec. 23, 2022, 136 Stat. 3060
Quick search by citation:
50 U.S. Code Part D - Savannah River Site, South Carolina
prev | next
Editorial Notes
Codification
Pub. L. 113–66, div. C, title XXXI, § 3146(e)(16)(C), Dec. 26, 2013, 127 Stat. 1078, redesignated part E as D.
Prior Provisions
A prior part D, consisting of sections 2621 to 2625, was redesignated part C of this subchapter by Pub. L. 113–66, div. C, title XXXI, § 3146(e)(16)(C), Dec. 26, 2013, 127 Stat. 1078.