30 CFR 779.21 - What information on soils must I include in my permit application?

§ 779.21 What information on soils must I include in my permit application?

Your permit application must include -

(a) The results of a reconnaissance inspection to determine whether the proposed permit area may contain prime farmland historically used for cropland, as required by § 785.17(b)(1) of this chapter.

(b)

(1) A map showing the soil mapping units located within the proposed permit area, if the National Cooperative Soil Survey has completed and published a soil survey of the area.

(2) The applicable soil survey information that the Natural Resources Conservation Service maintains for the soil mapping units identified in paragraph (b)(1) of this section. You may provide this information either in paper form or via a link to the appropriate element of the Natural Resources Conservation Service's soil survey Web site.

(c) A description of soil depths within the proposed permit area.

(d) Detailed information on soil quality, if you seek approval for the use of soil substitutes or supplements under § 780.12(e) of this chapter.

(e) The soil survey information required by § 785.17(b)(3) of this chapter if the reconnaissance inspection conducted under paragraph (a) of this section indicates that prime farmland historically used for cropland may be present.

(f) Any other information on soils that the regulatory authority finds necessary to determine land use capability.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code

Title 30 published on 2015-10-21

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 30 CFR Part 779 after this date.

  • 2016-12-20; vol. 81 # 244 - Tuesday, December 20, 2016
    1. 81 FR 93066 - Stream Protection Rule
      GPO FDSys XML | Text
      DEPARTMENT OF THE INTERIOR, Office of Surface Mining Reclamation and Enforcement
      Final rule.
      This rule is effective January 19, 2017.
      30 CFR Parts 700, 701, 773, 774, 777, 779, 780, 783, 784, 785, 800, 816, 817, 824, and 827
The section you are viewing is cited by the following CFR sections.