§ 63.1 Applicability Yes
§ 63.2 Definitions Yes
§ 63.3 Units and Abbreviations Yes
§ 63.4 Prohibited Activities Yes
§ 63.5 Construction/Reconstruction Yes
§ 63.6(a), (b), (c), (d), (e)(1)(iii), (f)(2)-(3), (g), (h)(2)-(8) Compliance with Standards and Maintenance Requirements Yes
§ 63.6(e)(1)(i) General Duty to Minimize Emissions No See § 63.7310(a) for general duty requirement.
§ 63.6(e)(1)(ii) Requirement to Correct Malfunctions ASAP No
§ 63.6(e)(3) SSM Plan Requirements No
§ 63.6(f)(1) SSM Exemption No
§ 63.6(h)(1) SSM Exemption No
§ 63.6(h)(9) Adjustment to an Opacity Emission Standard Yes
§ 63.7(a)(3), (b)-(d), (e)(2)-(4), (f)-(h) Performance Testing Requirements Yes
§ 63.7(e)(1) Performance Testing No See §§ 63.7322(a), 63.7324(a), and 63.7325(a).
§ 63.7(a)(1)-(2) Applicability and Performance Test Dates No Subpart CCCCC specifies applicability and dates.
§ 63.8(a)(1)-(3), (b), (c)(1)(ii), (c)(2)-(3), (c)(4)(i)-(ii), (c)(5)-(8), (d)(1)-(2), (e), (f)(1)-(5), (g)(1)-(4) Monitoring Requirements Yes CMS requirements in § 63.8(c)(4) (i)-(ii), (c)(5), and (c)(6) apply only to COMS for battery stacks.
§ 63.8(c)(1)(i) General Duty to Minimize Emissions and CMS Operation No
§ 63.8(c)(1)(iii) Requirement to Develop SSM Plan for CMS No
§ 63.8(a)(4) Additional Monitoring Requirements for Control Devices in § 63.11 No Flares are not a control device for subpart CCCCC affected sources.
§ 63.8(c)(4) Continuous Monitoring System (CMS) Requirements No Subpart CCCCC specifies requirements for operation of CMS.
§ 63.8(d)(3) Written procedures for CMS No See § 63.7342(b)(3).
§ 63.8(e)(4)-(5) Performance Evaluations Yes Except COMS performance evaluation must be conducted before the compliance date.
§ 63.8(f)(6) RATA Alternative No Subpart CCCCC does not require CEMS.
§ 63.8(g)(5) Data Reduction No Subpart CCCCC specifies data that can't be used in computing averages for COMS.
§ 63.9 Notification Requirements Yes Additional notifications for CMS in § 63.9(g) apply only to COMS for battery stacks.
§ 63.10(a), (b)(1), (b)(2)(vi)-(x), (b)(2)(xiv), (b)(3), (c)(1)-(6), (c)(9)-(14), (d)(1)-(4), (e)(1)-(2), (e)(4), (f) Recordkeeping and Reporting Requirements Yes Additional records for CMS in § 63.10(c)(1)-(6), (9)-(14), and reports in § 63.10(d)(1)-(2) apply only to COMS for battery stacks.
§ 63.10(b)(2)(i) Recordkeeping of Occurrence and Duration of Startups and Shutdowns No
§ 63.10(b)(2)(ii) Recordkeeping of Failures to Meet a Standard No See § 63.7342(a)(2)-(4).
§ 63.10(b)(2)(iii) Maintenance Records Yes
§ 63.10(b)(2)(iv) Actions Taken to Conform with SSM Plan No See § 63.7342(a)(4) for records of actions taken to minimize emissions.
§ 63.10(b)(2)(v) Actions Taken to Minimize Emissions During SSM No See § 63.7342(a)(4) for records of actions taken to minimize emissions.
§ 63.10(b)(2)(xi)-(xii) CMS Records for RATA Alternative No Subpart CCCCC doesn't require CEMS.
§ 63.10(c)(7)-(8) Records of Excess Emissions and Parameter Monitoring Exceedances for CMS No Subpart CCCCC specifies record requirements.
§ 63.10(c)(15) Use of SSM Plan No
§ 63.10(d)(5)(i) Periodic SSM Reports No See § 63.7341(c)(4) for malfunction reporting requirements.
§ 63.10(d)(5)(ii) Immediate SSM Reports No
§ 63.10(e)(3) Excess Emission Reports No Subpart CCCCC specifies reporting requirements.
§ 63.11 Control Device Requirements No Subpart CCCCC does not require flares.
§ 63.12 State Authority and Delegations Yes
§§ 63.13-63.16 Addresses, Incorporations by Reference, Availability of Information and Confidentiality, Performance Track Provisions Yes